BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Central Frontenac, Ontario. Completed plans call for site work for a bridge / tunnel.

Elbow Creek Bridge crosses Elbow Creek on the K&P Trail about 1.7 km north of the terminus of Ball Road and 3.9 km south of Tichborne, Ontario. Oclean Lane Bridge crosses Fish Creek on Oclean Lane about 2.4 km south of Tichborne, Ontario. Without limiting the generality of the contract, the work comprising the contract consists of, but is not necessarily limited to, the following: Elbow Creek: - Remove existing 3-span glue laminated timber bridge, two piers, and salvage abutment foundations. - Drive supplementary steel pipe piles for new abutments. - Construct two simple reinforced concrete abutments. - Install supplied prefabricated unitized steel truss. - Install supplied wood deck floor on truss. - Complete miscellaneous grading and guiderail. Oclean Lane Bridge: - Remove existing steel girders and timber deck. - Remove existing concrete abutments. - Excavate for new abutments. - Construct new reinforced concrete abutments. - Install supplied prefabricated steel girder bridge with steel plate deck. - Complete miscellaneous grading and guiderail. Approximate Quantities: - Concrete in Structure 40 cubic metres - Pile Driving 100 metres - Granular A 280 tonnes Question Deadline: 4:30 p.m. Local Time, Wednesday August 16, 2023 *Award value is unreleased.

Under Construction

Bridges / Tunnels

$700,000.00

Public - City

Site Work

30

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
101
Bidding Soon
1,219
All Active Projects
490
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 24, 2023

October 16, 2023

December 8, 2023

img_map_placeholder

K&P Rail Trail & Ball Rd, Central Frontenac, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.