BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 9, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Lake Township, Michigan. Completed plans call for site work for a water / sewer project.

LEIN CHECK (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email Subject must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. Please do not submit Electronic questions via Electronically. ALL questions should be emailed to Shane Brennan at shane.brennan@spicergroup.com no later than 4:00 p.m., Eastern on August 24, 2023. Construct a sheet pile retaining wall along the north face of the existing Platte River Lower Weir to prevent further undermining. Fill annular space between the sheet piling and weir concrete pile cap with peastone. Install riprap along the south face of the weir to fill undermined areas and protect from further erosion. Restore areas disturbed during construction. Contractors should only submit a maximum of two (2) attachments (both being less than 6 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability) Do not wait until just before the 2:00 p.m. solicitation deadline to submit your bid response. You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible. Bid Responses should not be emailed to the Project Director. Construction of an approximately 100ft long sheet pile wall along the north face of the Platte River Lower Weir. Backfilling of the annular space between the sheet pile and the weir with peastone. Placing of fieldstone riprap along the south face of the weir to fill undermined areas. Restoration of areas disturbed by construction activities.

Award

Water / Sewer

$388,040.00

Public - State/Provincial

Site Work

8

11

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
28
Bidding Soon
394
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 29, 2023

Project location map

Lake Michigan Rd, Lake Township, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.