BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a water / sewer project in Oakland, Tennessee. Completed plans call for site work for a water / sewer project; for the renovation of a water / sewer project; for the addition of a water / sewer project; and for the demolition of a water / sewer project.

The work involved is in one (1) contract and consists of the following generally described work: CONTRACT 22-01 WASTEWATER TREATMENT PLANT EXPANSION: Phase I: New 24-inch Force Main New Headworks New Splitter Box Two New Sequencing Batch Reactors (SBR) New Effluent Pumps New Sludge Digester All Associated Piping All Associated Electrical Work Site Work. Phase II: Renovation of the Existing SBR Basins Renovation of the Existing Sludge Digester All Associated Piping All Associated Electrical Work Site Work. The total allotted time for construction of Phase I is 545 days and an additional 180 days for Phase II for a total of 725 calendar days. Liquidated damages are $1,000 dollars per calendar day for either Phase I or Phase II deadlines. Payment and performance bonds required for 100 percent of the subcontract value. Contractors shall bring to this meeting the following pre-qualification information: (1) Current Tennessee contractor's license with the appropriate classification and a sufficient limit to perform the scope of work included in the subcontract; (2) Evidence that his surety company is currently listed on Treasury Department Circular 570 and will provide payment and performance bonds for 100 percent of the subcontract value by submitting a letter from said surety company stating they will provide the required bonding coverage for the subcontract; (3) Evidence that he can perform similar work in a timely manner by submitting a list of similar work completed within the past five years including the amounts of the contracts; (4) A statement that he has or does not have any pending litigation with similar projects; (5) A completed Application For Construction Prequalification (the Application For Construction Prequalification can be found in the Project Manual/Detailed Specifications). Failure to submit prequalification information by close of business the date of the Pre-Bid Meeting can result in disqualification.

Award

Water / Sewer

$28,700,000.00

Public - City

Addition, Demolition, Renovation, Site Work

50

9

10

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
32
Bidding Soon
437
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

November 16, 2023

img_map_placeholder

Multiple Locations, Oakland, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.