BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Sanford, Florida. Completed plans call for site work for a road / highway.

**As of March 12, 2024, the project was awarded to Integrated Environmental Technology, LLC , with an awarded amount of $189,563.** The awarded Contractor will construct a dry hydrant for fire protection and a water fill station at the Osceola Rd Landfill. Osceola Road Landfill does not have an adequate or reliable water distribution system for fire protection. The code allows other methods approved by the AHJ including a dry hydrant to be fed by an on-site water source (i.e. pond or lake). The water fill station will be fed by the same pond. S2L,Inc., the Engineer of Record, has developed a system design including a drawing and specifications to meet NFPA 1142 and prepared permitting documents to permit the system though the Seminole County Building and Fire Departments. Awarded Contractor will also be responsible for finalizing the Seminole County Permitting process. The Engineer's estimate for the project is $150,000.00. M/WBEs are encouraged to participate in the process. Question Deadline 01/08/2024 at 5:00 PM ET Any requests made to the County for this project, including requests for information or interpretation must be submitted no later than ten (10) calendar days prior to the opening date, Tony Durrum, Sr. Procurement Analyst 407-665-7123 (office) tdurrum@seminolecountyfl.gov (email) 180 calendar days: Total Project Time Project Description: Contractor shall construct a dry hydrant for fire protection at the Osceola Rd Landfill. A water fill station at the same location is being bid as an alternate item. Osceola Road Landfill does not have an adequate or reliable water distribution system for fire protection, the code allows other methods approved by the AHJ including a dry hydrant to be fed by an onsite water source (i.e. pond or lake). The water fill station can be fed by the same pond. Performance & Payment Bonds - 100% of the Contract Price. Provided at signing of agreement. Material & Workmanship Bond - 10% of Final Contract Price (due at project closeout

Award

Roads / Highways

$189,563.00

Public - County

Site Work

11

26

6

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
72
Bidding Soon
1,203
All Active Projects
520
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.