BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Edgewood, New Mexico. Completed plans call for the demolition of a bridge / tunnel.

reconstruction of the Bachelor Draw Pedestrian Bridge Project The Project includes the following Work: The project consists of rehabilitation and placement of an owner-provided steel bridge, additional structural and reinforcement steel, concrete abutments and drilled shafts, and other associated work as shown in the contract documents. The Project has an expected duration of 150 Calendar days for substantial completion and 180 Calendar Days for Final Completion from the date of the Notice to Proceed. Published in the Albuquerque Journal 7/30/23, 8/6/23 and 8/13/23

Post-Bid

Bridges / Tunnels

$560,000.00

Public - City

Demolition, New Construction, Paving, Site Work

30

10

4

10

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
22
Bidding Soon
243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.