Renovation of a detention facility in East Moline, Illinois. Completed plans call for the renovation of a detention facility.

The work includes the removal and relocation of existing kitchen equipment. Removal and replacement of walk-in coolers/freezers, new kitchen equipment, new exhaust hood and exhaust fan, associated plumbing and electrical systems. Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05. GENERAL - under $3,500,000.00 No faxed bid modifications will be allowed. No In-Person submittals of bids will be allowed. Bids and bid modifications will not be allowed via mail. For Step 3 Additional Information, the vendor must enter data about its organization, i.e. IPG Number, contact name. After clicking Submit, an email will be sent to the sender's email address to confirm receipt of the bidding documents. It is the vendor's responsibility to ensure that its bid and all required documentation are attached in the portal. For additional assistance related to the e-Builder system, email CDB@OnIndus.com. Questions submitted through the e-Builder module will not reviewed or responded to. In the event that the bidder experiences technical errors uploading and submitting its bid or bid modification into the system the bidder must submit a screenshot of the error it receives to CDB.CPO@illinois.gov prior to the bidding deadline. Once the error has been submitted, a vendor will be provided detailed instructions on submitting its bid or bid modification via an alternative file transfer system. CDB will evaluate the information provided in the email and, in consultation with the CPO's office, determine if the bid should be accepted or rejected. BID MODIFICATIONS: Modifications to bids submitted through the e-Builder portal shall be made in the portal at any time prior to the bidding deadline by logging into the e-Builder system, recalling the previously submitted bid, and submitting the revised bid amounts. In the event that the bidder experiences technical errors when making a modification to its bid in the e- Builder portal, the bidder must submit a screenshot of the error to CDB.CPO@illinois.gov prior to the bidding deadline. Once the error has been submitted, a vendor will be provided detailed instructions on submitting its bid or bid modification via an alternative file transfer system. CDB will evaluate the information provided in the email and, in consultation with the CPO's office, determine if the bid should be accepted or rejected. Meeting participants will not be able to ask questions either verbally or via the meeting's chat feature. Minority, Women, Persons with Disabilities and Veteran Business Subcontractor/Supplier Participation is Applicable. A. Prequalification. Bidders and protected subcontractors must be prequalified with CDB; allow 45 days for application processing. For an application and a copy of CDB's Standard Documents for Construction (applicable to this project). B. MBE/WBE/PBE/VBE.MBE/WBE/PBE/VBE firms must be certified or registered with State of Illinois Commission on Equity and Inclusion as an MBE, WBE, PBE, or VBE prior to bidding. C. Prevailing Wage. Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). D. Registration with the Illinois Procurement Gateway (IPG). All new and renewing vendors that request either Architect/Engineer, Construction Manager/Program Manager, or Contractor prequalification must be an "Active (Accepted)" registrant in the IPG. Vendors not subject to prequalification renewal prior to time of bid may pre- register with the IPG and receive a vendor registration number. The IPG is a web based system that serves as the primary location for entering, organizing, and reviewing vendor information. The IPG allows prospective vendors to provide disclosures, registrations, and other documentation needed to do business with the State in advance of any particular procurement. E. Certifications and Disclosures. New vendors and vendors renewing prequalification must have an approved Illinois Procurement Gateway registration number and completed Form B. Vendors not subject to prequalification renewal prior to time of bid have the option to submit the Standard Certifications and Disclosure Form(s) (Form A) with bid at time of submittal. Failure to provide a completed Form A standard certifications and financial disclosure or Form B, be registered with the Illinois Procurement Gateway, will result in rejection of bid. F. Subcontractors. You are also required to submit disclosure forms and standard certifications for subcontractors not considered incidental to the performance of the contract with an annual value over $100,000 within 20 days of execution of your contract with CDB or execution of the contract between you and your subcontractor, whichever is later. A valid IPG registration number can be provided in lieu of hard copies of the standard certifications and financial disclosure forms. (See D. above.) Subcontractors must receive an Authorization to Proceed prior to performance of any work. G. Supplement to SDC. Bidders are advised to review Article 01 11 01, Supplement to SDC, for any revisions to the Standard Documents for Construction. H. Progress Payments. Progress payments will normally be issued by the Illinois Comptroller within 30 business days after CDB receives and approves an Invoice-Voucher. I. For Single Prime Delivery Method Projects: Any reference in the Specifications and the Drawings for Multiple Prime Trades shall be considered as the Prime Bidding Trade. J. Bid Protest. Bidder may submit a written protest to the Protest Review Office following the requirements of the Administrative Rules, 44 Ill. Adm. Code 8.2075. For protests related to specifications, the Protest Review Office must physically receive the protest no later than fourteen (14) days after solicitation or related addendum was posted to the Bulletin. For protest related to rejection of individual bids or awards, the protest must be received by close of business no later than fourteen (14) days after the protesting party knows or should have known of the facts giving rise to the protest. K. Standard Documents for Construction. Unless otherwise instructed, reference throughout the contract documents to the Standard Documents for Construction shall be interpreted to include reference to the most recent Supplement to the applicable Standard Documents for Construction.

Award

Jails / Prisons

$3,288,000.00

Public - State/Provincial

Renovation

145

18

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
72
Bidding Soon
1,161
All Active Projects
478
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2023

October 9, 2023

July 15, 2024

img_map_placeholder

100 Hillcrest Rd, East Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.