BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2023 at 8:00 PM

Updated September 17, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Santa Rosa Beach, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Counties: Walton Road Name: CR 30A Limits: Over Western Lake, Bridge No. 600089 Project(s): 44333115201(*) Federal Aid No: D323059B Total Roadway Length: 0.242 Miles Contract Days: 450 Total Bridge Length: 0.028 Miles Total Proposal Length: 0.270 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 days Description: The Improvements under this Contract consist of replacing the existing low-level bridge including piles, sea wall and slope protection at existing CR 30A over Western Lake, Bridge No. 600089, constructing a new bridge, Bridge No. 604241, with roadway approach reconstruction using asphalt pavement, shoulder gutter, and guardrail. All work to be done in Walton County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 09/06/2023 Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order 004: Bridge Replacement - Cr 30A

Award

Bridges / Tunnels

$11,823,984.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

105

1

4

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
27
Bidding Soon
778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

September 23, 2023

Project location map

County Rd 30A, Santa Rosa Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.