BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a civil project in Georgetown, California. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.

127EAW23R0057 - GAOA Dru Barner CG Improvements El Dorado National Forest FAR 32.204 Disclosure of of the Construction Project: Between $250,000 and $500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 16th, 2022. A FS organized pre-proposal will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the constitute grounds for a claim after contract award. C.1 OF CONTRACT: The Eldorado National Forest proposes improvements to the Dru Barner Campground water system and access road. This project will replace the submersible pump in the vertical groundwater well at Dru Barner Campground, install a pole-mounted solar panel power system, install a security fence around the solar panels, clean the well, install power and control wiring, and install a water meter, iron filter system, booster pump, hydropneumatic tank, check valve, and a prefabricated building. Road improvements include roadbed reconditioning of the main loop road, placement of aggregate base in select areas, construction of rolling dip and rocked swale. Contractor shall furnish all material, labor, equipment, documentation, communication, notifications, and transportation as required to furnish and install the improvements described herein, as shown on the Project Plans, and as otherwise required by the Contract. All demolition, disposal, construction, and improvements described herein and as shown on the Project Plans are the responsibility of the Contractor. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON The Dru Barner Campground is located roughly 7 miles from Georgetown, California at 38_56'31" N, 120_45'57" W and an elevation of 3339 feet. From Georgetown drive northeast for 6 miles on Main Street/Wentworth Springs Road. Take a left on Bottle Hill Bypass Road, travel 1 mile, and then a left on Bottle Hill Road. Continue approximately 0.3 miles. The entrance to Dru Barner Campground is on the left. C.3 ESTIMATED START DATE / PERIOD OF (PoP) The estimated start date for this project is September 25th, 2023 with a 70 calendar day period of (PoP) after issuance of Notice to Proceed (NTP). C.4 OF CONSTRUCTION PROJECT FAR 32.204 - Disclosure of of the Construction Project: Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Paving, Renovation, Site Work

7

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
117
Bidding Soon
1,789
All Active Projects
739
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 30, 2023

September 25, 2023

img_map_placeholder

Bottle Hill Rd, Georgetown, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.