BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Tamarac, Florida. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Question Deadline: Tue Aug 29, 2023 5:00:00 PM (EDT) Electronic Auctions: Not Applicable The City of Tamarac is hereby requesting Bids, from qualified Contractors, for the construction of the NW 77th Street Swale Drainage and Concrete Sidewalk Improvements Project, Bid No. 23-33B.The project is located along NW 77th street (Westbound) between Nob Hill Road and Tamarac Sports Complex Entrance (Greenwood Blvd); and at the SE corner of NW 77th Street and NW 88th Terrace (Eastbound), just West of Pine Island Road, within the City of Tamarac. The work shall include, but not limited to clearing and grubbing, concrete sidewalk removal, asphalt pavement milling and resurfacing, full pavement removal and restoration, installing temporary and new pavement markings, new concrete sidewalks, installation of new drainage system, new concrete curb and gutter, swale regrading, site restoration and associated appurtenances required for the fulfillment of the Contract in accordance with the Contract Documents. The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, furnishing of all transportation and services, including fuel, power, communications, water, etc., as necessary to complete the project, as indicated in the Special Conditions, Special Provisions, Project Design Plans, Technical Specifications and Bid No. 23-33B Documents herein, along with all engineering, shop drawing and other documentation necessary to obtain all applicable permits and all bonds, securities, licenses and insurance to complete the project as specified herein and within the Project Design Plans. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications/scope of work and all applicable federal, state, county and local regulatory requirements.

Bid Results

Sidewalks / Parking Lot

$383,330.00

Public - City

Paving, Site Work

25

11

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
55
Bidding Soon
1,140
All Active Projects
476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

November 6, 2023

img_map_placeholder

NW 77th St, Tamarac, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.