Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving, new construction and renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a medical facility; for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and for paving for a pre-engineered storage facility.
As of February 7, 2024, the project has been awarded, however, a timeline for construction has not been confirmed. This project involves the renovation of an existing two-story building at 822 Geary Street and the installation of a new prefabricated modular building at 629 Hyde Street for two new outpatient clinics that will serve people experiencing homelessness: a Crisis Stabilization Unit (CSU) and a Wellness Hub, formerly referred to as an Overdose Prevention Program Services Site (OPPSS). The CSU is a short-term, urgent care clinic that will occupy the first floor of the existing building. The Wellness Hub is a part of San Francisco's Overdose Prevention Plan intended to reduce the number of overdose deaths in San Francisco and will be located in the new prefabricated modular building at 629 Hyde Street. The existing building at 822 Geary Street is a Qualified Historical Building per CHBC Section 8-201 and is listed on the National Register and California Register as a contributor to the Upper Tenderloin Historic District. It was previously a Goodwill Industries Store with a Group M occupancy classification. This project will change the occupancy of the building to a Group B occupancy classification. Renovations to the existing building includes but are not limited to structural improvement to concrete footings and grade beams, new wood shear walls and floor sheathing; new roofing; new exterior doors and windows; new HVAC system; new plumbing systems; new electrical service; new lighting; new security and video camera system; new fire alarm and sprinklers; and new interior floor, wall and ceiling finishes; and new signage. The site at 629 Hyde Street, which is adjacent to the building at 822 Geary Street, served as the parking lot for the former Goodwill Industries store with direct access to the building's second floor. In addition to procuring and installing the prefabricated modular building, site improvements at 629 Hyde Street include but are not limited to: demolition of existing shed; new concrete paving; new retaining walls; new metal fencing and gate; new trellis with fabric and glass canopy; and new signage. 277 consecutive calendar days from NTP to Substantial Completion. The Small Business Enterprise (SBE) subcontracting requirement for this project is 20%. Bidder is required to perform good faith efforts regardless of if the goal is met. Bid discounts per San Francisco Administrative Code Chapter 14B are not applicable to this contract. For details, contact Selormey Dzikunu by phone at (415) 939-9339 or by email at Selormey.Dzikunu@sfdpw.org. Right reserved to reject any or all quotations and waive any minor irregularities. For technical questions on the Bid Documents, scheduling of special field visits, and submittal of Request for Product Substitutions, contact the following ''Project Architect/Engineer'': Colin Mosher Bureau of Architecture San Francisco Public Works 49 South Van Ness Avenue, Suite 1100 San Francisco, CA 94103 Telephone: (628) 271-2973 Email: Colin.Mosher@sfdpw.org C. For questions on Federal bid documents and submittal of required Federal Forms, contact the following "Contract Compliance Officer": Selormey Dzikunu Contract Monitoring Division (CMD) General Services Agency City and County of San Francisco 1155 Market Street, 4th Floor San Francisco, CA 94103 Telephone: (628) 271-2094 Email: Selormey.Dzikunu@sfdpw.org Project no- W-DPH-2118-GEARY BLVD CRISIS SERVIC
Award
Medical
$11,762,855.00
Public - City
Demolition, New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 6, 2023
November 6, 2023
Multiple Locations, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Nov 30 2023
San Francisco, CA
Bid Date: Sep 07 2023
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 01 2023
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 14 2023
San Francisco, CA
Bid Date: Sep 14 2023
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.