Renovation of an educational facility in Flat Rock, North Carolina. Completed plans call for the renovation of a educational facility.
Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials, concrete pads, traffic control, supervision, disposal fees, permits, inspections to remove and replace existing boiler #2 located in the TEDC building on the campus of Blue Ridge Community College. Contractor is to meet or exceed all requirements and specifications outlined in the engineered drawings. Work area and equipment room to be left in a clean and good condition Time of Completion: The intent is to issue NTP by August 18th, 2023. The awarded Contractor must commence work within 7 days of NTP. It is preferred that the Contractor be complete by January 5th, 2024. The Contractor will be responsible for all fees to expedite material delivery to meet the January 5th, 2024 preferred completion date. Work must be complete by January 30th, 2024. Work completion includes the Contractor scheduling the State Boiler Inspector and passing State Boiler inspection. Contractor must submit a timeline for beginning and completion of the project A Payment & Performance Bond will be required for 100% of the contract amount. Install all materials and equipment in accordance with manufacturer's instructions and warranty requirements. Contractor is to obtain and pay for any and all required permits and inspections. This includes scheduling and passing the State boiler inspection. Any deficiencies found in the installation or materials used in the installation which prevents receiving a green tag from the State Boiler inspector will be the Contractor's responsibility and expense to correct. The only exception to this is that BRCC will pay for the actual State Boiler inspection. Contractor is to remove the existing unit, remove the unit from the premises, and disconnect piping is a way that it can be reconnected. Any modifications to doors or door frames for the removal of the old boiler #1 or delivery of the new boiler will be at the Contractor's expense. If modifications are needed, the Contractor is to restore doors & and door frames to existing conditions. Contractor is to reconnect to existing piping and/or replace piping in the vicinity of the unit to make the systems fully functional. Contractor will be responsible for all utility disconnections, reconnections including gas, electrical, plumbing, flue, fire alarm systems and WebCTRL. Contractor is to reintegrate the existing WebCTRL building automated system controls to the new boiler with existing functionality. Furnish the necessary supervision, labor, tools, equipment and materials to complete the work outlined in the engineered drawings and pre-bid meeting. As an option, the Contractor will provide pricing to rebuild any leaking pumps associated with boiler & repair/replace any leaking circulating pipes associated with the boiler. Work schedule limitations to be coordinated with the Blue Ridge Community College Project Coordinator. Project includes disposal of the boiler being replaced and debris offsite at the Contractor's expense. The contractor will not be allowed to use College dumpsters. Construction dumpsters will be the responsibility of the Contractor and at the Contractor's expense. Contractor will provide traffic flaggers for any road or lane closures needed for delivery of equipment or work to be done. Daily Cleanup of all affected work areas and paths of entry and material delivery or removal. Any damage to buildings, walk ways, pads, patios and foliage will be the responsibility of the Contractor to repair or replace at their expense. Owner is to receive training on all major equipment and controls for Facilities maintenance. Training will include a scheduled walk-through seminar for the owner's personnel. Explain the identification system, operation diagrams, emergency and alarm provisions, and sequencing requirements. Also explain requirements related to: seasonal provisions, security, safety and efficiency. Chemical Treatment will be provided by BRCC once boiler #2 is operational. It is proposed the contract will be awarded by Henderson County and "Letter of Intent to Award Contract" issued by August 18th, 2023 at 5:00pm. July 29th, 2023 at 5:00pm. Questions must be received in written form by email or USPS letter on or before, but NLT date indicated. Submit all questions to the BRCC Project Coordinator: (Marshallm@blueridge.edu) Henderson County reserves the right to reject any and / or all bids. Qualified contractors interested in bidding on this project may contact Mr. Marshall Morris @ marshallm@blueridge.edu .
Post-Bid
Educational
$90,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 10, 2023
August 18, 2023
49 E Campus Dr, Flat Rock, NC
Related To This Project
Flat Rock, NC
Bid Date: Aug 24 2023
Flat Rock, NC
Bid Date: Aug 23 2023
Flat Rock, NC
Bid Date: Aug 31 2023
Flat Rock, NC
Bid Date: Sep 14 2023
Flat Rock, NC
Bid Date: Nov 02 2023
Flat Rock, NC
Bid Date: Sep 20 2023
Flat Rock, NC
Bid Date: Oct 11 2023
Flat Rock, NC
Bid Date: Jan 25 2022
Flat Rock, NC
Bid Date: Aug 09 2023
Flat Rock, NC
Bid Date: Aug 17 2023
Flat Rock, NC
Bid Date: Jul 28 2023
Flat Rock, NC
Bid Date: Aug 09 2023
Flat Rock, NC
Bid Date: Aug 10 2023
Flat Rock, NC
Bid Date: May 25 2023
Flat Rock, NC
Bid Date: Apr 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.