BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2024 at 7:00 PM

Updated February 4, 2024

Site work and paving for a bridge / tunnel in Willowbrook, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Site Directions: Lane Court over Flagg Creek Tributary Est. Value Notes: $ 75,000.00 Est. Completion Date: April 30, 2024 The proposed work is officially known as "Lane Court Bridge Deck Repair Project" and further described as bridge deck repair and hot-mix asphalt resurfacing and patching on bridge deck all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). Obtain Information From: Jeff Barnett, PE, SE Christopher B. Burke Engineering, Ltd. 9575 West Higgins Road, Suite 600 Rosemont, IL 60018 (847) 823-0500

Bid Results

Bridges / Tunnels

$68,330.00

Public - City

Paving, Site Work

9

6

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
242
Bidding Soon
3,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

Project location map

Lane Ct, Willowbrook, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.