BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Jurupa Valley, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Bids Shall Be Valid for Ninety (90) Days After the Bid Opening Date. Scope: This Project Consists of Furnishing and Installing All Shade Structures and Lunch Shelters at Various School Sites Across the District. Scope Includes Demo, Earthwork, Ac Paving, Concrete, Reinforcing Steel, Landscaping and Irrigation, Electrical, Shade Structures, and Lunch Shelters. Project is Planned to Have an Approximate Duration From December 2023 Thru June 2024. Contractor S License: the Class of California Contractor S License Required in Order to Bid on and Perform the Contract for This Project Are: B. License Must Be Valid and Active at the Time of Award of Bid. For Information Regarding This Project, Prospective Bidders Are Requested to Contact: Marty Greenwood, Project Executive, Mgreenwood@tilden-coil.com Cell #951-378-4136 And/or Steve Fuentes, Project Manager, Sfuentes@tilden-coil.com Cell #909-821-0639 Bid Bond: Each Bid Must Be Submitted With Security in an Amount Not Less Than Ten Percent (10%) of the Maximum Bid Amount as a Guarantee That the Bidder Will Enter the Proposed Contract, Including All Required Contract Documents. Such Security Must Be in One of the Following Forms: (1) a Cashier S Check or Certified Check Made Payable to the District; or (2) a Bond Made Payable to the District in the Form Set Forth in the Contract Documents. Any Bond Must Have Been Issued by a California-admitted Surety as Defined in Code of Civil Procedure Section 995.120. Bid Process: the District Reserves the Right to Reject Any or All Bids or to Waive Any Irregularities or Informalities in Any Bids or in the Bidding. Except as Provided in Public Contract Code Section 5100 Et Sq. , No Bidder May Withdraw a Bid for a Period of Ninety (90) Calendar Days After the Opening of the Bids. Payment and Performance Bonds: the Successful Bidder Will Be Required to Provide Both a Performance Bond and a Separate Payment Bond, Each in an Amount Equal to 100% of the Total Contract Amount. The Forms of the Bond Are Set Forth in the Contract Documents and All Bonds Must Be Issued by a California-admitted Surety as Defined in California Code of Civil Procedure Section 995.120. RFIs must be submitted via e-mail to precon@tilden-coil.com and sfuentes@tilden-coil.com. Requestsfor information must be submitted prior to Friday, August 18th, 2023 at 5:00p.m.

Bid Results

Educational

$2,884,500.00

Public - County

New Construction, Site Work

125

7

9

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
219
Bidding Soon
3,608
All Active Projects
1,645
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2023

December 1, 2023

img_map_placeholder

4850 Pedley Rd, Jurupa Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.