BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 2, 2023, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for subject improvement. The proposed scope of work includes, but is not limited to, implementation of several ITS elements to improve local and regional mobility by addressing arterial congestion and improving transit mode share. These ITS design elements include traffic signal interconnect, travel time monitoring, dynamic message signs, closed-circuit television cameras, emergency vehicle preemption, and pedestrian countdown signals. In support of the proposed ITS improvements, other geometric design elements include full ADA compliance at signalized intersections, improved pedestrian access to transit, the addition of high visibility crosswalks, and far side relocation of bus stops at traffic signals where feasible and desirable. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 01 - RFQ - IL 56 from IL 59 to York Rd - IL 64 from York Rd to IL 50 (Cicero Ave, Phase III Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
100
Bidding Soon
2,069
All Active Projects
889
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

img_map_placeholder

Multiple Locations, Schaumburg, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.