BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elmhurst, Illinois. Conceptual plans call for site work for a water / sewer project.

The Complexity Factor for this project is 0.07. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2023, at 9:00 AM at the Region One/District One Office in Schaumburg. The department anticipates this project will be delivered using the Construction Management/General Contractor (CMGC) method as defined in the Department's Innovative Project Delivery Draft Manual and Guidelines. The Consultant will have the role of Engineer of Record (EOR) whilst developing the Phase II Engineering scope of work relevant to this project. Refer to the Manual and Guidelines for the various roles and responsibilities under the CMGC delivery method. In general, the role of the EOR develops the Phase II design to a level that allows a CMGC to prepare a price and schedule for the project. The EOR will work collaboratively with the CMGC and the department to develop the technical details to build the project. The department and the CMGC will negotiate a Guaranteed Maximum Price (GMP) for the construction management and construction based on the information prepared by the EOR. If the CMGC and the department cannot arrive at a mutually agreeable GMP the department may choose to ask for a GMP proposal from another CMGC or may choose to have the EOR proceed with Phase II Engineering for the purpose of a Design-Bid-Build Delivery Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The estimated construction cost for this project is $250,000,000 to $300,000,000. The completion date for this contract will be 18 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Plans (Lighting: Complex) Special Services (Electrical Engineering) The Environmental Reports (Environmental Assessment) prequalification category requirement may be completed by the Sub and/or Prime Consultant. The environmental work must be performed using staff that has been presented in your most recently approved Statement of Experience and Financial Condition. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 05 - RFQ Engineering - FAI 290 (Eisenhower Expressway) Drainage Improvements from West of Des Plaines River to East of Austin Blvd., Phase II Project, Cook County

Conceptual

Water / Sewer

$300,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
376
Active Projects
176
Bidding Soon
3,273
All Active Projects
1,387
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 23, 2024

February 23, 2026

img_map_placeholder

I-290, Elmhurst, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.