Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2023 at 8:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Seatonville, Illinois. Contact the soliciting agency for additional information.
The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase III engineering services are required to provide Reconstruction of I-80 mainline pavement from west of Joliet Junction Trail to west of Wheeler Avenue, Work included, but is not limited to, continuously reinforced PCC pavement with PCC shoulders, reconstruction of the I-80 Eastbound Bridge over Joliet Junction Trail, the I-80 Westbound Bridge over Joliet Junction Trail, I-80 Eastbound Bridge over Midland Avenue and the I-80 Westbound Bridge over Midland Avenue, drainage system improvements, signing, lighting, traffic signals, ITS improvements, noise abatement walls and all other work necessary to complete the improvement in accordance with the approved plans and specifications. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 11 - RFQ - I-80 from W of Joliet Junction Trail to Wheeler Ave & at Joliet Junction Trail (Abandoned RR), Phase III Project
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2024
Interstate 80, Seatonville, IL
Related To This Project
Seatonville, IL
Bid Date: Aug 02 2025
Cicero, IL
Bid Date: Aug 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
