BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Springfield, Illinois. Conceptual plans call for site work for a road / highway.

The Complexity Factor for this project is 0. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. Phase I Engineering services are required for collection of approximately 6,100 field traffic counts in Districts One and Two. The project will be conducted during the next two traffic count seasons in years 2024 and 2025. This will entail obtaining accurate machine traffic counts using magnetic lane counters, video camera devices, and road tube counters, and submitting the raw traffic data to the department's district project manager for processing. Five different types of machine traffic counts are required: 1. 24-hour volume/classification counts using magnetic lane counters (HiStars) or road tube classifiers 2. 24-hour volume counts using road tube counters 3. 48-hour volume/classification counts using magnetic lane counters (HiStars) or road tube classifiers for certain HPMS segment locations only 4. 24-hour Intersection turning movement counts with volume/classification data from video camera devices (Miovision) 5. 24-hour volume/classification counts on higher volume mainline routes from video camera devices (Miovision) For 2024, we are requesting machine traffic counts at locations on unmarked routes throughout DuPage and Stephenson counties. For 2025, we are requesting machine traffic counts at locations on the State Marked Route system (Interstate Routes, US Routes, IL State Routes) throughout Districts One and Two. In addition, we are requesting machine traffic counts at locations on unmarked routes in McHenry, Henry, and Rock Island counties. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Studies (Traffic Studies) category to be considered for this contract. Statements of Interest, including resumes of the consulting firm’s key people must be electronically submitted to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 046 - RFQ Engineering - Field Collection of Traffic Data on Various Routes for Various Counties in District One and District Two, Phase I Project.

Conceptual

Roads / Highways

$600,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
66
Bidding Soon
980
All Active Projects
467
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 23, 2024

December 31, 2025

img_map_placeholder

Multiple Locations, Springfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.