BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in San Marcos, California. Working plans call for the construction of a educational facility; for site work for a educational facility; and educational facility.

As of November 19th, 2024 the design stage portion of this project will not be completed until July of 2025. A design builder has been confirmed. An official construction timeline is currently unavailable. The Project encompasses the construction of a new academic building situated south of the University Hall Building and east of Markstein Hall, spanning approximately 65,000 to 120,000 gross square feet (GSF). This new facility aims to offer a blend of science and engineering programs, along with additional classrooms and student support areas. It will consist of teaching and research laboratories, spaces for teaching and learning, offices, student facilities, building support services, and a café. The design should include outdoor gathering spaces on the ground floor and potentially on the top floor of the building. The building will be four stories tall and will function as a standalone building, equipped with building systems designed to achieve net zero energy. There is also potential to utilize an additional well located on the building premises. The use of natural gas utility is prohibited, and a water source heat pump will supplement the heating requirements. The total square footage will include both exterior and interior circulation areas, necessitating the inclusion of a loading dock and a freight elevator in the plans. The project will entail the realignment of the existing service road, and adequate provisions for site fire protection services must be made. The ultimate objective is to create a building that achieves net zero energy consumption and obtain LEED Platinum certification.

Pre-Construction/Negotiated

Educational

$75,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

123 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
98
Bidding Soon
2,202
All Active Projects
991
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2023

December 1, 2025

img_map_placeholder

333 S Twin Oaks Valley Rd, San Marcos, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.