Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 26, 2023 at 8:00 PM
Updated November 15, 2023
Site work and paving for a road / highway in Evart, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
11.71 mi of crack treatment, single course chip seal and fog seal on M-115 from 16 Mile Road E to E Osceola County line, Gormer Carpool Lot at M-115/M-66 and M-115 from west of N River Road to west of Lake Station Avenue, Osceola and Clare Counties. This project includes a 2 year pavement warranty. Net classification required for this project is 1929 Ca In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3G. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec NH 18011 NH 67051 Job No 213852A 213347A Federal No 23A0756 23A0755 MI DOT - 2309 012 - Crack Treatment, Single Course Chip Seal and Fog Seal on M-115
Award
Roads / Highways
$2,106,016.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
October 31, 2023
US-115, Evart, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
