BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Evart, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

https://www.bigrapidsnews.com/news/article/evart-adopts-32m-capital-improvement-plan-19580091.php EVART — The Evart city council adopted the city’s Capital Improvement Plan for 2024-2030 following a public hearing during its meeting July 1. Pursuant to the Municipal Planning Commission Act, a municipality is required to adopt a six-year capital improvement program for its long-range planning objectives. Summer Sale! Dive into the news anytime with digital access: ONLY 25¢. ACT NOW Total estimated expenditures over the six-year period comes to $32,211,303, with approximately $9.6 million in expenditures on the city’s water system and $7.4 million on the wastewater system. Advertisement Article continues below this ad Another $1.3 million is planned for local streets and just over $1 million for major streets. Planned expenditures for local parks is estimated at $5.8 million over the six-year period, and another $6 million is planned for building improvements. Additionally, around $1.2 million is planned for equipment and vehicles over the six-year period. Projects planned for the 2024-2025 fiscal year include: Watermain replacement along US-10 at a cost of just over $1 million to be paid for through grant funding and the water fund; Gravity sewer replacements in fiscal year 2026-2027 and in fiscal year 2027-2028 at an estimated cost of just over $3.2 million; ----------------------------------------------- The Osceola Township (Owner) is requesting Bids for the construction of the following Project: Utility pot holing via vacuum extraction for purposes of determining water service and main material types, as well as verification of material type at the water service connection inside the homes and businesses for a random sampling of water service throughout the Osceola Township service area. Also includes asphalt, concrete, and landscape restoration of disturbed areas. Bid security shall be furnished in accordance with the Instructions to Bidders. The Bid Bond or certified check payable to Owner shall be in an amount no less than 5% of the maximum bid as a guarantee, that if the Bid is accepted, the Bidder will execute and file the Contract, Performance and Payment Bonds, and Insurance Certification, as required by the Contract Documents within (10) days after the Notice of Award. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Document note : Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Printed copies of the Bidding Documents may be obtained from the Issuing Office by paying a $50.00 non-refundable handling fee for each set of contract documents. Alternatively, bidding documents are available as portable document format [PDF] files for a non-refundable charge of $25.00. Make deposit checks for Bidding Documents payable to U.P. Engineers & Architects, Inc. The Owner reserves the right to waive any informality or to reject any or all bids.

Award

Water / Sewer

$280,780.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
25
Bidding Soon
421
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 9, 2024

img_map_placeholder

Multiple Locations, Evart, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.