BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a municipal facility in Buffalo, New York. Conceptual plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Please note that while workshopping this scope with the Authority and partner consultants in April 2023, critical infrastructure not explicitly called out in the 2014 NFA was identified as in need of repair or replacement. To ensure the integrity of the secondary treatment system and to meet the full intent of the NFA, namely, to treat a flow of up to 400 MGD, those critical "non-NFA" components are included herein. It is the opinion of the Authority that not including those items in these scope and schedule documents would create a false sense for the magnitude and cost of this undertaking. i. Soil Borings and geotechnical soil analysis ii. Outfall 002 Inspection iii. Topographic survey a. Installation of a new 22.5 MGD Final Settling Tank (FST) on the Battery A side: FST 9A i. Includes site dewatering, excavation, deep pile driving and weathertightness testing. ii. Includes connection of new FST 9A to existing Final Control Building and Final Effluent (FE) conduit iii. Depending on findings from Conditions Assessment, may include replacement of gates, control valves, actuators, meters and associated electrical and controls equipment in the existing Final Control Building to ensure new FST 9A operates as intended. The FE conduit on the Battery B side will be evaluated to assess whether a hydraulic Any questions must be received by Roberta L. Gaiek, P.E., Treatment Plant Administrator by Monday, August 14, 2023, 3:00 PM at rgaiek@buffalosewer.org. The Authority reserves the right, in its sole discretion, to amend this Request for Proposals at any time prior to the deadline for submission. The method of contractor has not determined at this time

Conceptual

Municipal

$2,000,000.00

Public - City

Addition, Demolition, New Construction, Site Work

9

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
98
Bidding Soon
2,510
All Active Projects
1,038
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.