Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a military facility in Somes Bar, California. Completed plans call for site work for a military facility.
Project Oak Bottom Compound Deck Replacement General Information 1.0 Background The decks, porches, railings, and stairs at the Oak Bottom Compound have suffered severe weather damage and dry rot. There are blackberry bushes and other plants and trees that have grown into and through the decks and railings. This has caused the decks, railings, and stairs to be compromised and are unsafe to use. The entryway porches have loose and missing deck boards and stair treads. The decks also have missing planks and some of the planking is too weak to stand on. 2.0 Scope of Work Cut back and de-brush all overgrowth of bushes, berry vines and small trees. Remove all decking, railings, stairs and any compromised framing and foundations of the existing decks and dispose of the debris off forest service property in a legal land fill or recycling facility. Repair any compromised areas of deck framing and foundations prior to installing the decks, railings, and stairways. Site Visit There will be no pre-bid site tour, however it is strongly advised that the Contractor thoroughly investigate the site to determine the full extent of the work and the quantities of materials needed. To make an appointment for a site visit contact Jerry McCluskey on the Six Rivers National Forest at (707) 672-3217. Contractor Requirements 3.0 Technical Requirements / Tasks Demolition: Cut back any bushes, vines or small trees that have overgrown into or through the decking. Remove all existing deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers and either recycle or dispose of in a landfill. Inspect all footings, piers, support columns, beams, ledgers, rim joists, joists and bridging for structural integrity and remove anything that does not meet industry standards. Construction: Replace any footings, piers, support columns, beams, ledgers, rim joist, joist and bridging that were removed. Install new deck flooring, railings, cap rails, balusters, balustrades, treads, risers, and stringers. Preferred Materials: Trex Transcend Composite Decking - Spiced Rum - 1" Square Edge Board (or equal, see specifications for salient characteristics). Trex Transcend Horizontal Railing (or equal, see specifications for salient characteristics): Components: Post Sleeve Skirt Post Sleeve Post Sleeve Cap Top Rail Bottom Rail Square Balusters All Necessary Hardware
Post-Bid
Military
$250,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to Project Search, and five free projects and companies. Subscribe for complete access to all contacts and documents to unlock opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
August 8, 2023
September 8, 2023
To Be Determined, Somes Bar, CA
Related To This Project
Redding, CA
Bid Date: Aug 22 2023
Los Angeles, CA
--
Delano, CA
--
Edwards AFB, CA
Bid Date: Sep 06 2023
San Luis Obispo, CA
Bid Date: Sep 06 2023
Yuba City, CA
Bid Date: Aug 15 2023
San Diego, CA
Bid Date: Aug 17 2023
San Diego, CA
Bid Date: Sep 01 2023
Cupertino, CA
Bid Date: Sep 28 2023
Riverside, CA
Bid Date: Sep 05 2023
Jackson, CA
--
Watsonville, CA
Bid Date: Aug 29 2023
Long Beach, CA
Bid Date: Aug 10 2023
Smartsville, CA
Bid Date: Sep 12 2023
San Jose, CA
Bid Date: Aug 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--