BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Demolition, site work and new construction of an industrial development in Crownpoint, New Mexico. Conceptual plans call for the demolition of a industrial development; for the construction of a industrial development; and for site work for a industrial development.

As of August 19, 2025, this project was canceled. The contractor shall be able to provide personnel who have been fully trained in all phases of Demolition and Construction of a Loading Dock Roof: Maintenance, Adjustments, and Repair. Contractor's personnel should be familiarized with all types of components including controllers, electrical components, general preventative maintenance, construction repairs and carpentry. Assessments and approval needed for Navajo Food Distribution Program (FDP) Warehouse Loading Dock Roof: 1. Contractor will complete an assessment on the condition of Loading Dock Roof whereas focus on all applicable industry codes and compliance standards will be accentuated; 2. Contractor will provide recommendations on the Scope of Work and provide quotes needed for any other replacements and repairs; 3. In the event of a major upgrade or improvement recommendation, Contractor will provide notice to the FDP Program Manager and Warehouse Supervisor; 4. Contractor will advise FDP Program Manager and Warehouse Supervisor in a meeting about recommendations for the Demolition and Construction of a Loading Dock Roof project; 5. Demolition and Construction of a Loading Dock Roof in accordance with applicable industry codes and compliance standards are contingent on the approval of the Navajo Food Distribution Program Manager and Warehouse Supervisor. The term of the Contract will be approximately four (4) Months from August 2023 to November 2023. If necessary, an option for a negotiable contract with respect to the term will require mutual agreements between both parties, Navajo Food Distribution Program and Contractor. The Navajo Food Distribution Program will reserve the right to reject any or all proposals and to waive informalities and minor irregularities in proposals received.

Project Abandoned

Industrial

$1,781,000.00

Public - Federal

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

August 20, 2025

Project location map

Multiple Locations, Crownpoint, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.