BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

Northwest and Northeast Reclaimed Tanks Rehabilitation Work of the Project includes abrasive blasting and coating the interior and exterior of four (4) Northwest Reclaim Tanks, and (1) Northeast Reclaim Tank, including all internal and external appurtenances; as well as providing a new cathodic protection systems. The Contractor will cut a 7-foot 4-inch by 8-foot door sheet for equipment access and weld the door sheet back in place once the interior work is concluded. Contractor shall remove all existing nuts and bolts and replace with new stainless steel washers, nuts, and bolts. After removing the existing coating from the reservoirs, Contractor shall replace any existing rafters which are identified as needing replacement and pit weld any large voids within the reservoirs. Question Deadline : 08/22/2023 Engineer Estimate: $6,916,953.02 - $7,877,640.93 Each Bid shall be submitted in accordance with the Instructions to Bidders and be accompanied by a Bid Security in the amount of five percent of the amount bid. The Successful Bidder states he or she must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions. Pre bid meeting held via Microsoft Teams. Please join the meeting from your computer, tablet, or smartphone Meeting ID: 256 248 604 536 Passcode: 9JiEbi , Download Teams | Join on the web Or call in (audio only) +1 915-255-2297,,335703229# United States, El Paso,Phone Conference ID: 335 703 229# Find a local number | Reset PIN , Learn More | Meeting options Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents. Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all immaterial, nonconforming, nonresponsive, unbalanced, or conditional Bids *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$7,877,640.00

Public - City

Site Work

28

19

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
255
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2023

October 20, 2023

img_map_placeholder

Multiple Locations, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.