Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2025 at 8:00 PM

Updated November 15, 2025

New construction of an educational facility in Fullerton, California. Completed plans call for the construction of a 78,000-square-foot educational facility.

The scope of work consists of a single contract for the construction of the new 78,000 square foot Music/Drama Complex followed by the demolition of Buildings 1100 and 1300. The site is currently a landscaped sculpture yard located at the corner of Chapman Avenue and Lemon Street adjacent to the Wilshire Auditorium. The contract includes General conditions, Project Supervision and Administration, provision of temporary facilities and controls. The Music/Drama Complex includes the following spaces: 550 seat Auditorium for music and drama performances, Choral Room, Practice Rooms, Classrooms and Labs, Recording Studio, Faculty Offices & Dean’s Office As of June 25, 2025, an architect and a general contractor have been selected. Construction is expected to begin in the fourth quarter of 2025 and be complete in 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information.

Award

Educational

$30,724,153.00

Public - County

New Construction

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
295
Bidding Soon
4,519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

October 6, 2025

Project location map

321 E Chapman Ave, Fullerton, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed