Site work for a water / sewer project in Salamanca, New York. Completed plans call for site work for a water / sewer project.

Rehabilitation of the sanitary sewer system in the Red House area of Allegany State Park. Work includes in-place relining of the existing sewer piping, manhole repair and installations, and pump station upgrades. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amount of $61,256.00. The completion date for this project is 180 days after agreement has been approved by the NYS Comptrollers Office. Project Specific Liquidated Damages (Refer to Article 14.10 of the General Conditions). $1,750.00/day The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All Requests for Information (RFIs) are due by: 3:00 PM on Thursday, August 24, 2023

Bid Results

Water / Sewer

$1,579,631.00

Public - State/Provincial

Site Work

15

11

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Plastic Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
97
Bidding Soon
1,327
All Active Projects
626
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 30, 2023

img_map_placeholder

2373 Allegany State Park Rte 1, Salamanca, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Red House Sanitary Sewer Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.