Published October 25, 2023 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a road / highway in Alameda, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

**As of October 25, 2023, this project has not yet been awarded. The project is expected to be awarded on November 7, 2023.** The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with Streetlight Conduit Replacement - Fernside Boulevard Project. Approximate cost of construction: $520,000.00 The Contractor shall begin Work no later than five working days following the start date specified in the Notice to Proceed, which may be hand delivered or sent by email. The Contractor shall complete all Work on the Project within Seventy (70) Working days after the above start date. The Contractor, and all Subcontractors, shall pay all workers not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations("DIR"), State of California, for the Work performed, pursuant to sections 1770 et seq. of the California Labor Code. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by the DIR, are on file at the City. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. Pursuant to Public Contract Code ("PCC") section 4104, no contractor or subcontractor shall be qualified to bid on, or be listed in a bid proposal unless currently registered to perform public work pursuant to Section 1725.5. No bids will be accepted from a Contractor who has not been licensed in accordance with Business and Professions Code section 7000 and following. The General Contractor shall possess a valid Class A construction license issued by the California Contractors State License Board for this Project. Bidders are responsible for obtaining any and all changes to the plans, specifications, proposal forms, addenda, other project notifications, and documents during the bid process. A bid is invalid if the Bidder has not deposited it at the designated location prior to the time and date for receipt of bids indicated in this Notice Inviting Bids or prior to any addendum extension thereof. The City reserves the right to reject any or all bids; to waive minor defects or technicalities; or to solicit new bids. As per PCC section 20170, all bids shall be submitted under seal and accompanied by cash, a bidder's bond executed by an admitted surety insurer, a cashier's check, or certified check payable to the City of Alameda in an amount equal to 10% of the total amount bid (PCC 20171). Upon award of the contract, the successful Bidder shall furnish a bond for faithful performance in the amount of 100% of the total bid. The successful Bidder shall also furnish a bond to secure the payment of all claims for labor and material in the amount of 100% of the total bid. Further, the successful Bidder, and all subcontractors, shall pay for and obtain a City of Alameda Business License. Retention: The Contractor may elect to receive 100% of payments due under the contract from time to time, without the City retaining any portion of the payment, by depositing securities of equivalent value with the City or in an escrow agent pursuant to PCC section 22300. Such securities, if deposited by the Contractor, shall be valued by the City's Risk Manager whose decision on valuation of the securities shall be final. The Contractor's attention is called to the Business and Professions Code section 7108.5, which generally requires subcontractors to be paid not later than seven days after receipt of each progress payment. Please direct any Project questions to Trung Nguyen. Questions must be by written email to tnguyen@alamedaca.gov and received by 5:00 p.m. Wednesday, August 23, 2023.

Bid Results

Roads / Highways

$749,426.00

Public - City

Outdoor Lighting, Site Work

16

15

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Construction Aids, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
122
Bidding Soon
1,978
All Active Projects
952
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 2, 2023

img_map_placeholder

Fernside Blvd, Alameda, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Streetlight Conduit Replacement - Fernside Boulevard Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.