BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Luis Obispo, California. Completed plans call for site work for a water / sewer project.

In general, the project consists of grading new bypass channels in the San Luis Obispo Creek floodplain, grading within San Luis Obispo Creek to reshape existing creek banks and connect to the new bypass channels, replacement of the existing Bianchi Lane Bridge and associated roadway and utility improvements in Bianchi Lane, sediment removal at the Marsh Street Bridge, removal of an existing building adjacent to San Luis Obispo Creek on Higuera Street, grading of the City owned parcel referred to as Matthews Open Space including removal of contaminated soil, constructing two new driveway entrances on Higuera Street at the Matthews Open Space, removal of existing trees and other vegetation, removal of invasive plant species, installing vegetated rock slope protection, and revegetation and temporary irrigation. Q & A deadline: Oct 10, 2024 2:00:00 PM EDT Contract time is established as 233 working days. There is a three-year plant establishment period that begins following final acceptance of work. The fixed liquidated damages amount is established at $6,000 per day for failure to complete the work within the contract time. The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any informality in a bid. If any accommodations are needed to participate in the bid process, please contact Allie Genard (805) 781-7200 or by Telecommunications Device for the Deaf at (805) 781-7107.

GC Bidding

Water / Sewer

$9,400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
36
Bidding Soon
459
All Active Projects
208
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 10, 2024

December 9, 2024

October 30, 2025

img_map_placeholder

Madonna Rd, San Luis Obispo, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.