BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Platina, California. Completed plans call for the renovation of a municipal facility.

127EAW23R0061 - Harrison Gulch Office HVAC Shasta - Trinity National Forest FAR 32.204 Disclosure of of the Construction Project: Between $25,000 and $100,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 23rd, 2023. An organized will be held on Monday, August 21st, 2023, 10:00 AM PST See Provision 452.237-71(page 35) for details In no event shall failure to inspect the constitute grounds for a claim after contract award. PLEASE RSVP TO THE BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The purpose of this project is to remove and replace the existing outdoor AC/heater packaged units at the Main Office 2555 Hwy 36, Platina CA. Units 1 and 2 are the same size and Unit 3 is somewhat smaller. All three units are located at the rear of the office building and access has logistical challenges but feasible from the west side of the office. The existing units are R-22 refrigerant and new units shall be with CA compliant refrigerant systems. New units shall be California compliant minimum SEER/EER rating. Note all new systems shall be of the same manufacturer for system compatibility and warranty purposes. Work shall include but not necessarily limited to, disconnect and removal of existing exterior units, including related plenums and ducting, interfering electrical, low voltage, natural gas & condensate lines to be replaced, clearing, preparation and placement of new pads and mounts. Furnishing and installation of new electrical disconnects, new AC/Heater units with new exterior plenums and ducting, duct sealing, tie-ins to existing structure ducting, all electrical, low voltage, natural gas and condensate lines, and related connections for complete and operational systems, including startup, testing and warranties. Contractor shall furnish all material, labor, equipment, and transportation as required to accomplish the work. All demolition, disposal, and repairs described herein, for bringing the unit back into service are the responsibility of the Contractor.

Post-Bid

Municipal

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
5
Bidding Soon
106
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 29, 2023

img_map_placeholder

2555 CA-36, Platina, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.