Site work, paving and renovation of a bridge / tunnel in Butternut, Wisconsin. Completed plans call for the renovation of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a bridge / tunnel.
Award Details Contract Award Date: Sep 26, 2023 Contract Award Number: 12445523C0030 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: H6KET3PEMAV9 Contractor Awarded Name: Larson Construction Co., Inc. Contractor Awarded Address: Chippewa Falls, WI 54729 USA Base and All Options Value (Total Contract Value): $1,647,735.45 Chequamegon/Nicolet Nursery Bridge Project Description Project is a total small business set-aside under NAICS Code 237310 $45M. Project magnatude is betweeen $1M and $3M. NURSERY ROAD (FR162) OVER EAST FORK CHIPPEWA RIVER Project is near Butternut, WI Full replacement of existing 5 span sawn timber bridge with a new 3 span bridge. New bridge will consist of a steel H-pile with poured reinforced concrete wall abutment and pier substructure, a glulaminated treated timber girder superstructure, a glulaminated treated timber deck with glulaminated treated timber rails and an asphalt paved wearing surface. Allow steel angle diaphragms Item 55901 Membrane Waterproofing to be an optional bid item. Alternative superstructure/ deck/ and railing combinations are allowed. All must meet HL-93 loading requirements, L/500 max deflection, match clear width geometry of planned bridge, structure depth not to exceed planned dimension (48"). If structure depth is less than planned, hold top of substructure elevations as planned and lower roadway elevations accordingly. Rail must be timber TL2 minimum but alternative designs may be accepted Allow dowel laminated deck panels with ship-lap joints in lieu of glulam Allow steel girders in lieu of glulam Allow panel-lam longitudinal timber slab Allow solid sawn Allow concrete I - beam If alternative superstructure/deck/railings is proposed, provided alternative preliminary plans and alternative bid schedule along with bid or proposal for planned structure. OF CONSTRUCTION PROJEC Project is estimated between $1,000,000 and $3,000,000. TRAVEL NORTH ALONG STH 13 FROM THE INSTERSECTION OF STH 13 AND CTH F IN THE VILLAGE OF BUTTERNUT FOR APPROXIMATELY 0.8 MILES. TURN LEFT ONTO BEAR LAKE ROAD AND TRAVEL WEST APPROXIMATELY 9 MILES. TURN LEFT ONTO BEAR LAKE ROAD (FH 163) AND TRAVEL SOUTHWEST FOR APPROXIMATELY 5 MILES. TURN RIGHT ONTO NURSERY ROAD (FH 162) AND TRAVEL NORTH APPROXIMATELY 0.5 MILE TO THE NURSERY ROAD BRIDGE. 45.9909 degrees Latitude, -90.7687 degrees Longitude (4) The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$1,647,735.00
Public - Federal
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2023
November 24, 2023
Nursery Road(FR162), Butternut, WI
Related To This Project
Butternut, WI
Bid Date: Mar 16 2022
Butternut, WI
Bid Date: Oct 11 2023
Butternut, WI
Bid Date: Oct 18 2023
Butternut, WI
Bid Date: Jun 12 2024
Butternut, WI
Bid Date: Jun 26 2024
Butternut, WI
Bid Date: Jul 17 2024
Butternut, WI
Bid Date: Aug 19 2024
Butternut, WI
Bid Date: Oct 11 2024
Butternut, WI
Bid Date: Jun 19 2023
Butternut, WI
Bid Date: Jun 08 2022
Butternut, WI
Bid Date: May 18 2022
Kaukauna, WI
Bid Date: Aug 30 2023
Coleman, WI
Bid Date: Aug 16 2023
Milwaukee, WI
Bid Date: Sep 14 2023
Milwaukee, WI
Bid Date: Aug 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.