BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Orange Park, Florida. Completed plans call for the renovation of a water / sewer project.

LS2 IMPROVEMENTS (PART A) The Selected Contractor shall perform the Work complete, in place and make ready for construction of a complete rehabilitation of the existing Clay County Utility Authority (CCUA) Lift Station 2 (LS2) duplex pump station as a triplex pump station as described in the Contract Documents. The LS2 shall always stay in operation during construction either by the existing LS2 components or temporary bypass pumping operations. The Selected Bidder shall furnish, unless otherwise noted, all necessary permits, labor, equipment and materials to complete the following: 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work o Remove, demolish and/or abandon equipment and structures from LS2 site including but not limited to pump building, pumps, level control equipment, discharge pipes, and all other equipment in wet well interior, valves, and fittings, wet well, gravity sewer piping, forcemain, electrical equipment, control panels, power pole and overhead service, generator, electrical conduits, concrete pads and other concrete structure, and existing water and telephone services. Demolition may require phasing in order to maintain the existing LS2 in operation during the primary duration of the construction period. Equipment shall be retained by CCUA as noted in the construction documents. o Remove vegetation, noted trees, and clear site as needed. o Temporarily remove and restore fencing along access drive to LS2 as necessary for construction equipment access. Site shall remain secure at all times. o Install new 10-feet (inside diameter) precast polymer concrete wet well structure. o Install five new 4-feet (inside diameter) precast polymer concrete manholes, including two saddle manholes and one manhole with drop connection. o Install new 10-inch and 15-inch PVC gravity sewer piping between new manholes and wet well structure to reroute gravity sewer. o Install new triplex pumps, bases, stainless steel discharge and suction piping, cable rack, level control equipment, above grade stainless steel piping and valves, below grade 10-inch PVC forcemain, tapping sleeve and valve for connection to existing 10-inch forcemain. Use 10-inch linestop and plug to abandon segment of existing 10-inch forcemain. o Install new pump station control panel to CCUA standards, PLC Controls, Operator Interface Panel. o Install new electrical service, service meter, service entrance main breaker, demarcation box, electrical equipment racks, grounding, conduit, and wire, and site light. o Install new generator with integral fuel tank and enclosure on cast-in-place concrete foundation. o Bypass the lift station by establishing bypass pumps, piping, and connections between the influent gravity sewer or wet well and the existing 6-inch discharge forcemain bypass connection onsite. Detailed bypassing specifications are provided. o Cut, fill and grade LS2 site, construct new concrete slab and cast-in-place retaining wall at LS2, new gravel/rock driveway to property line, and grass parking area within site. o Install new 2-inch water service from Shenandoah Drive S and new backflow preventer and hose connection. o Construct new chain link fencing with privacy slats and 16 ft wide double swing gate around LS2 site. Construct bump stop along south and west sides of concrete pad. o Construct new handrail/guardrail system along access drive transition to lower site. Construct curb as indicated. o Restore all areas of lift station site, access drive, and Shenandoah Drive S right-of-way disturbed by proposed construction. o Collect and remove to an approved disposal facility all construction debris, trash, garbage, etc. that results from the Contractor's operations. LS3 IMPROVEMENTS (PART B) The Selected Contractor shall perform the Work complete, in place and make ready for construction of a complete rehabilitation of the existing Clay County Utility Authority (CCUA) Lift Station 3 (LS3) duplex pump station as described in the Contract Documents. The LS3 shall always stay in operation during construction either by the existing LS3 components or temporary bypass pumping operations. The Selected Bidder shall furnish, unless otherwise noted, all necessary permits, labor, equipment and materials to complete the following: 1. Mobilization/Demobilization, General Requirements, Bonds and Insurance. 2. Contractor is responsible for protecting existing materials, structures, and equipment on-site during construction activities. 3. Site Work o Remove, demolish and/or abandon equipment and structures from LS3 site including but not limited to pump building, pumps, level control equipment, discharge pipes, and all other equipment in wet well interior, valves, and fittings, wet well, gravity sewer piping, electrical equipment, control panels, telemetry tower, fence (partial) and gate, power pole and overhead service, generator and slab, electrical conduits, and existing water services. Demolition may require phasing in order to maintain the existing LS3 in operation during the primary duration of the construction period. Equipment shall be retained by CCUA as noted in the construction documents. o Remove vegetation and clear site as needed. o Remove existing chain link fencing and gates fronting Moody Avenue. Replace fencing with new chain link fencing with privacy slats and double swing gate. o Install new 8-feet (inside diameter) precast polymer concrete wet well structure. o Install four new 4-feet (inside diameter) precast polymer concrete manholes, including one saddle manhole and two manholes with drop connections. o Install new 8-inch and 10-inch PVC gravity sewer piping between new manholes and wet well structures to reroute gravity sewer. o Install new pumps, bases, stainless steel discharge and suction piping, cable rack, level control equipment, above grade stainless steel piping and valves, below grade 6-inch PVC forcemain, 6-inch insert valve, and connection to existing 6-inch forcemain. o Install new pump station control panel to CCUA standards, PLC Controls, Operator Interface Panel. o Install new electrical service, service meter, service entrance main breaker, demarcation box, electrical equipment racks, grounding, conduit, and wire, and site light. o Install new generator with integral fuel tank and enclosure on cast-in-place concrete foundation. Bypass the lift station by establishing bypass pumps, piping, and connections between the influent gravity sewer or wet well and the existing dual 4-inch discharge forcemain bypass connection onsite. Detailed bypassing specifications are provided. o Remove portion of existing water services and replace with new backflow preventer and hose connection in alternate location. Install new water service and end connections for static water pressure reading. o Fill and grade LS3 site, construct new concrete slab at LS3, new concrete driveway to Moody Avenue, and rock cover within site. o Restore all areas of lift station site and Moody Avenue right-of-way disturbed by proposed construction. o Collect and remove to an approved disposal facility all construction debris, trash, garbage, etc. that results from the Contractor's operations. Question Deadline 09/12/2023 at 5:00 PM ET Questions Due Date Online Portal Location of Work: 2724 Shenandoah Drive S., Orange Park, FL 21-1025, 21-236.01, 21-269

Award

Water / Sewer

$4,511,301.00

Public - County

Renovation

78

25

6

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
38
Bidding Soon
741
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

November 6, 2023

img_map_placeholder

2724 Shenandoah Dr S, Orange Park, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.