BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Marina, California. Completed plans call for site work for a water / sewer project.

Perform services for the removal of an underground storage tank at the Moss Landing Pump Station of Monterey One Water. The Contractor shall perform all Work within the time stipulated in the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the work required in strict compliance with the Contract Documents Question Deadline 08/30/2023 at 5:00 PM PT Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond in an amount not be less than ten percent (10%) of the submitted Total Bid Price. A hard copy of the Bid Security must be received by Monterey One Water prior to the date and time of the bid opening, or the bid will be considered nonresponsive. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price, PRIOR TO EXECUTION OF THE Contract. For further information, contact Jennifer Gonzalez, Engineering Manager, at jennifer@my1water.org or (831) 883-6172. The Contractor and its surety shall be liable to M1W for any damages arising as a result of the Contractor's failure to comply with this obligation. Without limiting the foregoing description, Contractor's scope of work includes, but is not limited to, the following: - Submit all required samples, product data, certificates, operations and maintenance instructions, guarantees, and other submittals no later than five (5) days after the date M1W issues a Notice to Proceed. - Obtain all necessary permits and approvals for the Work. - Protect all materials to be used in the Work in accordance with the specifications. - Protect existing facilities and personal property. - Attend a preconstruction conference with M1W to discuss schedule, access, sequence of work, and other issues. - Prepare and submit a written daily activity report to M1W for each day on which work is performed, including weekends and holidays when worked, and submit the reports to M1W no later than the next business day. The daily reports shall, at a minimum, include the following information: construction activities and locations, construction crew sizes of general and subcontractors, start or completion of activities, progress on construction activities (including units or portions of work completed), tests or inspections performed, deliveries of material or equipment, delays or potential delays, visitors to the site, weather conditions, construction equipment used, and personal injuries or damage to property. - The Contractor shall be responsible for unloading, hoisting and otherwise handling its own materials, supplies and equipment. - Coordinate with owner-scheduled events. - The Contractor is responsible for researching and complying with all local codes, agencies and jurisdictions that regulate and govern the Work. - Contractor shall set up, identify, coordinate, provide safe access, and obtain all inspections for its work, as required by any authorized agency or applicable code, prior to covering up work

Award

Water / Sewer

$39,013.00

Public - County

Site Work

8

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
69
Bidding Soon
1,525
All Active Projects
660
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2023

October 1, 2023

img_map_placeholder

14811 Del Monte Blvd, Marina, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.