Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Aurora, Colorado. Completed plans call for the renovation of a educational facility.
Project has been Rebid. Estimated Construction Cost: $1,463,271 (Fixed Limit of Construction Costs, FLCC) (Ph 1) Total Project Budget: $1,847,537 (combined hard and soft costs) (Ph 1) The University of Colorado Anschutz Medical Campus seeks a highly qualified Architecture/Engineering team to provide engineering design, construction documentation and contract administration services to replace the terminal box air valve system that serves the vivarium in Research 1 North (R1N). Phase 1 of this project is currently funded through the state-controlled maintenance program (FY 2023-2024). Controlledmaintenance funding for Phase 2 of the project is expected to be received in FY 20242025. It's anticipated that the selected A/E team for Phase 1 will continue on with Phase 2. Although the majority of this project involves M/E/P engineering design, it is desired that the team also include architectural services to fully coordinate the construction documents and specifications, as well as lead construction administration. CU Anschutz medical research relies on modern vivarium facilities to ensure compliance with NIH grants policy and regulations. Laboratory animal facilities present complex building maintenance and repair challenges. Vivarium HVAC systems are critical to program operation and AAALAC accreditation. Protocol violations affecting HVAC operation can result in suspensions, fines, funding problems, program disruption, and facility loss of use. Inadequate HVAC systems risk loss of accreditation and faculty recruitment concerns. The R1N vivarium ventilation system currently has operational problems requiring replacement of the terminal box air valve system. The air valves precisely control temperature and ventilation and resides in the interstitial space above the vivarium. There are 145 supply air valves with reheat coils, 114 general exhaust air valves, 39 cage rack exhaust valves, 16 Biosafety Cabinet exhaust valves and 5 other miscellaneous exhaust valves. The existing air valves are pressure independent venturi style with internal plunger and spring. These air valves do not have airflow measurement, therefore separate crossring airflow stations were provided to report airflow to the building automaton system (BAS). The potential to disrupt operations or vivarium program delivery associated with this building system is intermittent. The two-phase solution includes new equipment to replace the ventilation system serving the vivarium space. Each of the two phases of this project will complete approximately half of the total required scope of work. Design and construction will need to be planned and coordinated between each phase to maintain continuous and uninterrupted vivarium operation throughout. The interstitial space above the vivarium is comprised of catwalks to service the ventilation system components and other equipment. Most of the air valves are located adjacent to the catwalk. Therefore, most air valves are readily accessible for replacement. However, there are approximately 35 air valves that are too far away from the edge of the catwalk and will require scaffolding or other platforms to be installed to access air valves for replacement. Depending on how the contractor arranges scaffolding, there will likely need to be 20-30 areas of scaffolding or platforms constructed in order to replace these hard-toreach air valves. The reheat coils do not have true isolation valves since "valve packs" were used where balancing valves are also intended for isolation. Therefore, drain-down of the heating water system and additional "quadrant" isolation valves are recommended to be installed for future isolation without having to affect other areas of the vivarium. Control valves for the coils, while still operational are beyond their useful life. Reheat coils will be replaced in the same location to minimize the cost of accessories. Point of Contact: Name: Robert Holzwarth Phone: (720) 854-4664 Email: robert.holzwarth@cuanschutz.edu Please prepare submittals as follows: a. Submittals should not exceed 40 double-sided pages (letter size, 8-1/2" x 11") of content. b. Cover page and section title pages do not count towards the 40-page limit. c. Please do not use smaller than 10-point fonts for readability. d. Submittals should be ordered and contain the five (5) distinct sections as outlined in section II. SUBMITTAL REQUIREMENTS. Separate each section by a title page. e. PDF submittal size is limited to 25 MB by CU Anschutz submission website. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have University of Colorado Anschutz Medical Campus staff available to discuss the project. Firms preparing submittals must attend and sign-in in order to have their submittals accepted.
Post-Bid
Educational
$1,847,537.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2023
December 19, 2023
12800 E 19th Ave, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Nov 30 2023
Aurora, CO
Bid Date: Sep 07 2023
Aurora, CO
Bid Date: Sep 13 2023
Aurora, CO
--
Aurora, CO
Bid Date: Nov 15 2018
Aurora, CO
Bid Date: Sep 13 2023
Aurora, CO
Bid Date: Aug 28 2023
Aurora, CO
Bid Date: Aug 23 2023
Aurora, CO
Bid Date: Aug 31 2023
Aurora, CO
Bid Date: Aug 10 2023
Aurora, CO
Bid Date: Sep 26 2023
Aurora, CO
Bid Date: Aug 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.