Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Syracuse, New York. Working plans call for the renovation of a medical facility.
Statement of Work The Syracuse VAMC has a need to upgrade the following Air Handler Equipment. AHU-02, AHU-07, AHU-11. Additionally, Addendum work for IC Exhaust Fans and CWS-201 will be completed during this project. Features of this new equipment will humidification/dehumidification, heating and cooling, energy recovery, ductwork, piping, insulation, controls, and specific ancillary equipment that meet the design requirements. The Contractor will be responsible for performing this work in (2) Phases based on work location. Phase 1 Replace AHU-02, and AHU-07. AHU-11. These units are located on the 10th Floor, Shaft 2, and Shaft 5 respectively. A temporary AHU and Exhaust is required for each unit. AHU 07 will utilize AHU42 as the temporary unit. These units are required to provide air to various areas of the facility continuously. Similar Mechanical and Electrical will be required to complete each unit. Contractor required to maintain all temporary equipment during the duration of this contract. Phase 2 After the AHU s are installed, Phase 2 consists of the Addendum work relocating and replacing CWS-201, and replacing Infection Control Fans EF-77, EF-78, and EF-79 with Duplex Fan Systems as shown on the drawings. The existing Exhaust Fans are to remain intact and in-use until the switch over is completed. Contractor should refer to contract documents including drawings and specifications for a complete and detailed description & requirements of work to be performed. Contractor to provide all necessary supervision, labor, materials, and equipment necessary to complete all work in the specified time allotted. Work required may include but not limited to mechanical, electrical, demolition, controls, ductwork, piping, louvers/dampers, insulation, VFD, heat exchangers/pumps, and remediating mechanical/electrical interferences. The new units will be required to interface with the existing Johnson Controls Metasys Building Management System and allow for collection of data and response to alarm conditions. A brief non-inclusive outline of the proposed scope of work is listed below: Temporary and Permanent Roof Work Temporary AHU s, Mechanical, Electrical, and Structural Demo and/or Installation Rigging and Installation of Temporary and Permanent Equipment Existing Equipment shutdown and Temporary Equipment Start-Up Mechanical, Electrical, and Structural Demo Site Preparation for New Equipment Mechanical, Electrical, and Structural Installation Equipment Rigging and Installation Final connections and preparations Sprinkler and Fire Safety Work Controls and Building System Interface New Equipment Start-Up, Commissioning, and Certification Temporary Equipment Removal Clean-Up and Punch List Work Hours: Work is to be performed during normal business hours (Monday Friday, 8am 4pm). All electrical, steam, chilled and hot water shutdowns shall be coordinated with COR and scheduled after normal business hours. Work may be performed during evenings and/or weekends if coordinated in advance with COR. . Project Duration: The duration of this project is expected to be 450 days. Contractor shall provide contact information for all individuals who will be working on-site 7 days prior to start of work. Summary of New Equipment AHU-02 14000 CFM Shaft 5 10th Floor Temporary Unit Required AHU 07 4000 CFM Shaft 2 8th Floor Temporary Unit Required AHU 11 5000 CFM Shaft 3 5th Floor Temporary Unit Required Duplex Fan Systems for EF-77, EF-78, EF-79 Relocated/New CWS-20
Final Planning
Medical
$250,000.00
Public - Federal
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2023
800 Irving Ave, Syracuse, NY
Related To This Project
Syracuse, NY
Bid Date: Sep 01 2023
Syracuse, NY
Bid Date: Sep 11 2023
Syracuse, NY
Bid Date: Oct 31 2023
Syracuse, NY
Bid Date: Aug 31 2023
Syracuse, NY
Bid Date: Sep 28 2023
Syracuse, NY
Bid Date: Sep 07 2023
Syracuse, NY
--
Syracuse, NY
Bid Date: Oct 24 2023
Syracuse, NY
Bid Date: Aug 18 2023
Syracuse, NY
Bid Date: Sep 20 2023
Syracuse, NY
Bid Date: Sep 12 2023
Syracuse, NY
Bid Date: Aug 09 2023
Syracuse, NY
Bid Date: Mar 28 2024
Syracuse, NY
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.