Remodeling of a fire / police facility in Adelanto, California. Completed plans call for the remodel of a 465-square-foot fire / police facility.

**As of November 3,2023, project was awarded to KNC Construction, Inc., awarded amount is $179,583.06.** Bids must be accompanied by a Bidder's Bond in the form of a certified or cashier's check or a corporate surety bond in an amount not less than ten percent (10%) of the bid amount. Prior to execution of the Contract, the successful bidder shall provide one-hundred percent (100%) Faithful Performance and one-hundred percent (100%) Payment bonds based on the bid amount accepted by the City. This project generally consists of Tenant Improvements at the Fire Station per Plans and Specifications. Engineer's estimate for this project is $117,000 Any prospective bidder desiring an explanation or interpretation of the solicitations, specifications, etc., must request it in writing to: Saba Engineer, P.E. City Engineer Email: sengineer@adelantoca.gov by no later than 10:00 a.m. on September 8, 2023 in order to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all prospective bidders as an amendment to the solicitation, if that information is necessary to submitting bids or if the lack of it would be prejudicial to other prospective bidders. All contractors shall be licensed in accordance with the laws of State of California, must hold a valid Class "A" license, and any contractor not so licensed shall be subject to the penalties imposed by such laws. Contractor shall possess the appropriate license prior to award of Contract. The Contractor shall pay the City of Adelanto the sum of $1,000.00 per day for each and every calendar day delay in finishing the work in excess of Two Hundred and Forty (240) CALENDAR DAYS as specified above as Liquidated Damages. The Work under this contract shall be diligently prosecuted to completion before expiration of the Sixth (60) CALENDAR DAYS beginning within fifteen calendar days after the "Notice to proceed" date

Award

Fire / Police

$179,595.00

Public - City

Remodeling

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
101
Bidding Soon
2,142
All Active Projects
968
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

November 15, 2023

img_map_placeholder

10370 Rancho Rd, Adelanto, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.