Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Poinciana, Florida. Contact the soliciting agency for additional information.
The Cypress Lake Project is located in the vicinity of Lake Cypress Road in Kenansville, Florida. The work to be performed includes, but is not limited to preconstruction, final design and permitting phase (Preconstruction Phase), construction, testing, and startup of the water treatment facilities (including supply and disposal wells and conveyance) [Commissioning Phase] and commencing of plant operations [Operating Phase] including raw water production and concentrate disposal wells, raw water mains and other appurtenances as required for a functional facility. The following generally describes the facilities included in the initial project construction. Raw Water Wells and Conveyance - Construction and installation of raw water pumps, associated well-head piping, and ancillary instrumentation and equipment for Lower Floridan aquifer production wells and raw water transmission mains. Future raw water production wells may be drilled under a separate contract or may be included in the CMAR contract. Water Treatment Plant - The water treatment plant includes but is not limited to treatment, storage and pumping facilities constructed on a greenfield site. Phase 1 of the RO process will be designed to produce up to 15+ MGD of finished water in incremental phases. Treatment includes pretreatment, RO process, and post treatment. Treatment, and pumping and storage facilities are described below: Pretreatment - The pretreatment processes will include chemical and physical pretreatment and other necessary appurtenances. RO Process - The RO process will include RO feed pumps, RO treatment skids, the RO membrane clean-in-place system, and other necessary appurtenances. Post Treatment - Post treatment processes will include chemical storage and pumping, degasification, disinfection, post-treatment stabilization, and other necessary appurtenances. Finished Water Pumping and Storage - Finished water pumping and storage will include transfer pumping, prestressed concrete ground storage tanks, high service pumping, finished water transmission mains, and other necessary appurtenances. Concentrate Disposal - The concentrate disposal facilities include but not limited to concentrate storage, concentrate booster pumps, conveyance piping, and two (2) concentrate disposal wells. In addition to the facilities described above the project will include operations buildings, buildings to house equipment as appropriate, civil site improvements, stormwater improvements, electrical equipment and auxiliary power generators, and other appurtenances as necessary for a fully functional facility. The Draft Preliminary Design Report (PDR) is provided in Attachment A. The Draft PDR provides the basis of design for the Project. However, the requirements identified in the PDR are not inclusive of all the requirements needed to complete the project.
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2024
Lake Cypress Rd, Poinciana, FL
Related To This Project
Poinciana, FL
Bid Date: Mar 23 2022
Poinciana, FL
Bid Date: Sep 19 2022
Poinciana, FL
Bid Date: Sep 22 2020
Poinciana, FL
Bid Date: Jul 18 2024
Poinciana, FL
Bid Date: Aug 22 2024
Poinciana, FL
Bid Date: Sep 16 2024
Poinciana, FL
Bid Date: Aug 04 2023
Poinciana, FL
Bid Date: May 25 2023
Poinciana, FL
--
Poinciana, FL
--
Poinciana, FL
--
Poinciana, FL
Bid Date: Sep 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.