BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Las Vegas, Nevada. Completed plans call for the renovation of a clubhouse / community center.

The City of Las Vegas (Owner) hereby invites qualified firms or individuals (Bidders) to submit Bids for mechanical, plumbing and electrical equipment upgrades at the central plant. Work of the Project includes mechanical, plumbing and electrical equipment upgrades Question Deadline: 09/05/2023 at 8:00 PM PT Estimate: $1,450,000 - $1,525,000 Bid Bond or, at the option of the Bidder, may be in the form of a cashier's check, certified check or money order provided the instrument is issued in the name of the City of Las Vegas as the payee, the Performance Bond, Labor and Material Payment Bond and the Guaranty Bond, attached, required. A business that is at least fifty-one percent (51%) minority-owned, operated and actively controlled by one or more minorities. In the case of a publicly owned business, at least fifty-one percent (51%) of the stock must be minority-owned and the business must be operated and actively controlled by a minority. A business that is at least fifty-one percent (51%) disabled veteran-owned, operated and actively controlled by one or more disabled veterans, or in the case of a publicly owned business, at least fifty-one percent (51%) of the stock must be owned and the business operated and actively controlled by a disabled veteran. The City reserves the right to waive any minor informality or irregularity in any Bid submission, and to correct technical, data entry or computation errors. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document ~ $1,450,000 - $1,525,000 COMPLETION DEADLINE Bidder acknowledges all Work on the project must be completed within 90 calendar days of Notice to Proceed date.

Bid Results

Clubhouse / Community Centers

$819,065.00

Public - City

Renovation

38

16

4

4

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
18
Bidding Soon
436
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

November 27, 2023

img_map_placeholder

3521 N Durango Dr, Las Vegas, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.