New construction of an educational facility in Lamont, California. Completed plans call for the construction of a primary / secondary education facility.

Job walk taking place on 08/24 @ 2:30pm is only Mandatory for the following Bid Packages: a. 02-05-000/Demolition b. 02-11-000/ Earthwork c. 02-14-000/Site Utilities d. 16-00-000/Electrical COMPLETION OF WORK: 1. The work of this bid package must be complete according to the construction schedule included with contract documents. 2. The construction schedule prepared by the Construction Manager (CM) and/or other target dates pertaining to this bid package must be adhered to by the Prime Contractor or liquidated damage will be assessed by OWNER in the amount listed in the Agreement. No extension of time will be granted unless the circumstances are within the stipulations of the General Conditions. 3. Procurement of materials and/or equipment shall be done in a timely manner to comply with the project schedule. Materials and/or equipment properly stored, in accordance with the Owner's requirements, will be paid for as noted in the Contract Documents. 4. Clean-up related to work performed under this section. Clean-up of one area before moving to another area to perform work. 5. Provide submittals as required by contract documents to include product data, shop drawings, samples, and/or color charts as applicable. 6. The term "provide" means to "furnish and install, complete and ready for the intended use." 7. The work includes, but is not necessarily limited to, the items numerically listed below and in accordance with the applicable Drawings and Specifications section(s). Provide all work specified within this Bid Package and DESCRIPTION: Drawings and general provisions of Contract, including General and Supplementary Conditions, Division - 00 Bidding and Contract Requirements and Division 01 General Requirements apply to the work of this Bid Package. The work under this Bid Package shall include the furnishing and installing of all material, equipment, procedures, methods, items, and labor as required to complete the work described in this Bid Package. The work shall be completed as shown on the Drawings and specified in any applicable specification sections.

Post-Bid

Educational

$1,500,000.00

Public - City

New Construction

7

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
504
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

November 2, 2023

img_map_placeholder

8201 Palm Ave, Lamont, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.