Published August 25, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a stadium in Canonsburg, Pennsylvania. Completed plans call for site work for a stadium.

All work shall be conducted in accordance with the Scheduling Requirements of the Work as hereafter specified. The Contractors shall be responsible for the means, methods and sequences to implement the specified schedule. 1. The Contractor shall be responsible for submitting a Project Schedule, as specified in Section 007216 "General Conditions" Article 3. 2. Note: Construction schedules representing anything less than a five day work week shall not be permitted, see also Section 007216 "General Conditions" Article 3, Paragraph 3.10. B. The site is limited in size. Visitors and school occupants/personnel shall have use of the existing parking areas and drives. Construction traffic and deliveries shall be restricted on-site between certain hours so as not to interfere with the school arrival/dismissal schedules. Site access for construction equipment/activities shall be coordinated with the School District. Construction equipment, trailer, vehicles and material storage, if required, shall be located as directed by the Architect and Owner at the initial Job Conference. Contractor shall be restricted to this area. Only one (1) trailer will be permitted for the Contractor, if needed, and shall be located in the area designated above. All other parking and material storage, which cannot take place within the area(s) designated above, shall take place off site. Failure of the Contractor to police his workmen's parking and material storage requirements shall result in withheld payments and/or fines. 1. Contractor shall repair/restore any area used for staging, storage, parking, etc., as well as any areas damaged by construction activities, to original or better condition at completion of work. C. Scheduling of all work shall be coordinated with the Owner, as well as access routes to work areas. 1. Work requiring any shut-offs / shut-downs of heating, plumbing and/or electrical services shall be scheduled with the Owner. Advance notice must be given to the Architect and the School District when any shut-offs or shut-downs are scheduled Such Bid Bond or Check shall be submitted with the understanding that it shall guarantee that the Bidder's Bid will not be withdrawn for a period of at least sixty (60) days after the scheduled closing time for receipt of bids; that if the Bid is accepted, the Bidder will execute the Form of Agreement, as provided by the Owner, with all blanks appropriately filled and will submit the required 100% Performance and Labor and Material Bonds (submitted on A.I.A. Document A312) and 100% Maintenance Bond as specified in Section 007216, Article 11; and that in the event of withdrawal of said Bid within said period, or the failure to enter into said Agreement and submit said Bonds within ten days after the Bidder has received notice of the acceptance of the Bid, the Bidder shall be liable to the above mentioned Owner for the full amount of such Bond or Check as representing the damage to the Owner on account of the default of the Bidder in any particular hereof The Owner reserves the right to accept or decline the Contractor's Withdrawal of Bid Request and reserves the right to retain the bid bond.

Post-Bid

Arenas / Stadiums

$72,000.00

Public - County

Site Work

9

11

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Grandstands and Bleachers
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
132
Bidding Soon
1,091
All Active Projects
531
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

October 11, 2023

img_map_placeholder

1 N Jefferson Ave, Canonsburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Pressbox & Bleacher Seating Extension at the Canonsburg Memorial Stadium

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.