BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Site work and new construction of a warehouse / distribution facility in Stockton, California. Conceptual plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Sheriff's Office - Evidence Facility Location: Sheriff's Office, French Camp The project consists of a new, stand-alone Evidence/Property Room, complete with track shelving. This new facility will include offi ce space for staff, a large room to store evidence, a separate room for homicide related evidence, a vault to store drugs, a vault to store fi rearms and cash, a room for deputies to book evidence, an intake room for staff to intake and process evidence, room for evidence that has been reviewed and awaiting disposal and/or return to owner, restroom facilities, an area for refrigerators/ freezers used to store biological or temperature sensitive evidence and a new parking lot. This building would also require an outside covered area to store items such as oil barrels or any other hazardous material that would be improper to store indoors. This new facility will require the building and perimeter of the building to be reinforced and secure to maintain the security and integrity of evidence being stored. This project is included in the San Joaquin County's FY 2024-2028 Capital Improvement Program (CIP). As of March 28, 2024, information regarding a design team or a general contractor is not available. Funding is anticipated in 2024/2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Warehouse / Distribution

$9,900,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
13
Bidding Soon
1,887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.