Published August 22, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; and swimming pool.

The City of Pittsburgh Office of Management and Budget, on behalf of the department of Public Works, is soliciting bids for Mechanical/HVAC Construction Services for Homewood Park. The awarded Contractor will be responsible for the following items, at a minimum: Project coordination, permits, bonds, and improvements associated with the Field House and Pool House Building Mechanical construction as identified on Drawings H001, H300, and H400. A Bid bond will be required for this project. Bonds should be five percent (5%) of the total proposed bid. Performance and Payment bonds will both be required from the awarded vendor. Payment and Performance bonds will both be one hundred percent (100%) of the contracted cost. By the time of award for this solicitation, the City will have entered into agreements with, or at least identified, vendors for General Construction, Plumbing, and Electrical work. This solicitation is solely intended to gather HVAC/Mechanical trade bids. Question Submission Deadline: September 6, 2023, 5:00pm Question Submission Method: All questions shall be submitted Electronically The City reserves the right to request clarification of any bid before bid award. The City reserves the right to reject, for any reason, any or all bids if it is in the best interest(s) of the City to do so. Substantial project completion shall occur by spring of 2025 ( a specific date to be agreed upon by all parties). All prospective bidders acknowledge and agree to be bound by these conditions. The City of Pittsburgh is committed to the ideal of providing all citizens an equal opportunity to participate in City and its Authorities' contracting opportunities. It is therefore the City's goal to encourage increased participation of women and minority groups in all City contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of Minority-Owned Business Enterprises (MBE's) and Women-Owned Business Enterprises (WBE's) in work to be performed under City contracts. The levels of MBE and WBE participation will be monitored by the City of Pittsburghs Equal Opportunity Review Commission (EORC). In order to ensure that there are opportunities for historically disadvantaged minority groups and women to participate on Covered Contracts, and consistent with the City's current equal employment opportunity practice and goals, the EORC will review contracts to include an evaluation of a developer/contractors employment of minority groups and women, encourage goals of eighteen (18) percent and seven (7) percent respectively. It is also the City's goal to encourage participation by veteran-owned small businesses in all contracts. The City of Pittsburgh shall have an annual goal of not less than five (5) percent participation by veteran-owned small businesses in all contracts. The participation goal shall apply to the overall dollar amount expended with respect to the contracts. The City requires that all respondents demonstrate good faith efforts to obtain the participation of veteran-owned small business in work to be performed under City contracts. The levels of veteran-owned participation will be monitored by the City of Pittsburghs EORC.

Post-Bid

Swimming Pools

$200,000.00

Public - City

Site Work

181

40

2

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Shop-Fabricated Wood Trusses, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Flooring, Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Plastic-Laminate-Clad Lockers, Plastic Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Musical Equipment, Bells, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Special Structures, Fabric Structures, Tensioned Fabric Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems, Swimming Pool Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Air-to-Air Energy Recovery Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Public Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Subdrainage, Drainage Layers, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Purification Equipment, Gas and Liquid Purification Process Equipment, Chemical Feed Systems
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
58
Bidding Soon
954
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 13, 2023

img_map_placeholder

540 N Lang Ave, Pittsburgh, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Homewood Park Infrastructure Upgrades: Mechanical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.