Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.
The Work includes an annual contract paid on a monthly basis for regular landscaping maintenance at Seattle Tacoma International Airport (STIA) SOUTH AREA and surrounding properties. Annual contract paid on a monthly flat rate for regular landscaping maintenance at Seattle Tacoma International Airport; the work includes the requirements for furnishing all labor, tools, specialized equipment, materials, supervision and transportation to provide proper weed control, litter removal, removal of cuttings, care and maintenance for: irrigation systems, lawns, all planters, landscaped areas, trees, shrubs and other plant materials within the project limits for healthy growth, neatly trimmed and visually attractive landscaped areas. Time and material changes, by Work Authorizations, may be required for events and activities such as irrigation repairs, diseased/distress/dead plant replacement, herbicides, fertilizer, earth movement (slides), plant/pest control, maintenance support for mitigation areas, tree topping, tree cutting, tree removal, stump removal, hydro seeding and any other landscape/plant related items that are not normally associated with the recurring general maintenance. Recycling of waste from the projects and use of recycled products is encouraged. The contract may be renewed at the POS option for a subsequent year. In addition to the base monthly maintenance work, the Port Project Manager may assign time and material work under this contract to the Contractor via written Work Authorizations. Each Work Authorization will describe the location and scope of work to be completed as well as the time for completion. The work detailed in each Work Authorization shall be performed as directed in the Work Authorization and in accordance with the Specifications herein and all applicable federal, state and local regulations. The work may not be continuous and shall be based on "on-call" requests for work as needs arise. The dollar amount of each Work Authorization will be based on a time and material estimate provided to the Port Project Manager by the contractor at the rates and markups bid on Document 00 41 00 Schedule of Unit Prices. The Work includes: Annual contract paid on a monthly flat rate for regular landscaping maintenance at Seattle Tacoma International Airport; the work includes the requirements for furnishing all labor, tools, specialized equipment, materials, supervision and transportation to provide proper weed control, litter removal, removal of cuttings, care and maintenance for: irrigation systems, lawns, all planters, landscaped areas, trees, shrubs and other plant materials within the project limits for healthy growth, neatly trimmed and visually attractive landscaped areas. Time and material changes, by Work Authorizations, may be required for events and activities such as irrigation repairs, diseased/distress/dead plant replacement, herbicides, fertilizer, earth movement (slides), plant/pest control, maintenance support for mitigation areas, tree topping, tree cutting, tree removal, stump removal, hydro seeding and any other landscape/plant related items that are not normally associated with the recurring general maintenance The Contractor shall furnish all labor, tools, equipment, materials and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 - Bid Form. The contract will be awarded for an estimated amount not to exceed $350,000.00, which excludes Washington State Sales Tax. The contract will last one (1) year, 365 calendar days, from the official contract award date, which is the date the Port of Seattle signs the Agreement, or until the contract amount is depleted, whichever comes first. This contract contains an option to extend the contract time up to 12 months beyond the original contract completion date. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. No bid bond is required. Labor and Industries require a "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid". The expense of such is the responsibility of the Contractor. If the Port exercises its option to extend the contract an additional year, then new Intents and Affidavits will be required for the additional contract year at the prevailing wage rates published at that time. The contract rates will be amended to reflect the changes in prevailing wage, if any.
Post-Bid
Transportation Terminals
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2023
October 2, 2023
17801 International Blvd, Seattle, WA
Related To This Project
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Sep 19 2023
Seattle, WA
Bid Date: Mar 12 2024
Seattle, WA
Bid Date: Sep 18 2023
Seattle, WA
Bid Date: Sep 21 2023
Seattle, WA
Bid Date: Sep 08 2023
Seattle, WA
Bid Date: Sep 20 2023
Seattle, WA
Bid Date: Aug 16 2023
Seattle, WA
Bid Date: Aug 18 2023
Seattle, WA
--
Seattle, WA
Bid Date: Sep 04 2023
Seattle, WA
Bid Date: Aug 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.