BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a educational facility.

The Project consists of all labor, materials equipment and services necessary to [Install remote door access equipment, central exchange units, client stations and associated low voltage wiring and electrified door hardware at (2) school sites]. Description of Phase 1: Mission High Work Hours: This work is limited to off-hours. Contractor shall perform work between the hours of 4pm - 9pm Monday, Tuesday, Thursday & Friday. The Contractor may work between the hours of 2pm - 9pm on Wednesdays. Weekend work is allowable between the hours of 8am - 8pm. Scope of work includes, but not limited to: the installation of (3) new Aiphone door stations, installation of electrified doors hardware and power supply at (3) existing exterior doors, (1) new client station to be located in the Main Office (Room 110), (1) new CEU to be installed in the most compatible MDF or IDF to be proposed by the Contractor and approved by the District Representative. Contractor shall verify the location of any existing equipment in field prior to installation. The Contractor shall install all required low voltage wiring from the (3) new Aiphones to the CEU and from the CEU to the new client station. The Contractor shall submit the proposed conduit layout plan to the District for review and approval prior to installation. Refer to the drawings and specifications for additional requirements related this site. Description of Phase 2: June Jordan High School Work Hours: This work is limited to off-hours. Contractor shall perform work between the hours of 4pm - 9pm Monday, Tuesday, Thursday & Friday. The Contractor may work between the hours of 2pm - 9pm on Wednesdays. Weekend work is allowable between the hours of 8am - 8pm. Scope of work includes, but not limited to: relocation of (1) existing Aiphone, installation of electrified door hardware and power supply on an existing exterior door, (1) new client station to be located in the Admin Office (Room 325), associated cabling and wiring from the relocated Aiphone to the client station and existing CEU located in Office 324. The Contractor shall submit the proposed conduit layout plan to the District for review and approval prior to installation.

Bid Results

Educational

$57,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
79
Bidding Soon
1,789
All Active Projects
741
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

August 31, 2023

img_map_placeholder

325 La Grande Ave, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.