BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a civil project in Half Moon Bay, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

The project requires professional engineering services to evaluate proposed new trail, rerouted trail, and road to trail alignments based on underlying geologic conditions. The project may need permits from agencies, including but not limited to, San Mateo County Planning and Building Departments including a Coastal Development Permit, County Department of Public Works Encroachment Permit, California Department of Fish & Wildlife, Regional Water Quality Control Board, and United States Army Corps of Engineers. The District will prepare any necessary regulatory agency permits and pay any associated fees. The District's trail construction crew completed layout of the preliminary trail alignments based on observable conditions, including landform observations, known sensitive species populations, and proximity to jurisdictional areas such as streams, wetlands, and riparian habitats. The preliminary alignment totals seven miles incorporation approximately 2.8 miles of existing routes and 4.4 miles of proposed new trail construction, at least two (2) trail bridges will be required, and multiple 16'-20' span puncheons (District standard detail). The trail will also likely require other drainage crossing solutions, minor retaining walls (District standard detail <30" high), and rocked sections of trail tread. A segment of trail along Verde Road is within the San Mateo County Right-of-way and will require an encroachment permit with San Mateo County Department of Public Works. Additionally the project may incorporate some road removal/abandonment to serve as mitigation for project related impacts to natural resources. The District's trail construction crew will build the trail and structures (i.e. trail bridges, retaining walls, etc.) based on the final design. The consultant shall provide a letter report summarizing existing conditions and engineering geology recommendations. The consultant shall provide design and engineering services including an evaluation of the proposed trail alignments and improvements from a geological perspective, preparation of plans suitable to permit the project through San Mateo County Planning and Building Departments, and engineering services during construction as necessary during implementation by the District's trail construction crew. The District will use the design plans and associated calculations, with support from the consultant, to apply for and receive building permits from San Mateo County for any trail structures required. The District will use the 60% design plan (Task 1c) to apply for any required regulatory permits. The deadline to submit questions is August 31, 2023 at 5:00pm. Please submit all requests to: Bryan Apple, Capital Projects Field Manager bapple@openspace.org Midpeninsula Regional Open Space District 5050 El Camino Real Los Altos, CA 94022 The method of Contractor Selection has not been Determined at this time

Conceptual

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
78
Bidding Soon
1,608
All Active Projects
676
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

img_map_placeholder

To Be Determined, Half Moon Bay, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.