Site work for a bridge / tunnel in Temple, Georgia. Completed plans call for site work for a bridge / tunnel.

All questions about the bid process, plans or specifications must be submitted in writing to purchase@paulding.gov. The Mud Green Road Culvert Replacement Project consists of installing a three span aluminum arch culvert in place of existing two barrel 42" corrugated metal pipe crossing. Three additional metal pipe crossings will be replaced with reinforced concrete pipe in existing location. Temporary turnarounds will be built on each end in order to close the roadway and expedite construction. The County may at any time, as the need arises, order changes within the scope of the services without invalidating the Contract Agreement. If such changes increase or decrease the amount due under the Contract Documents, or in the time required for performance of the services, an equitable adjustment shall be negotiated culminated by the issuance of a Contract Amendment. The Contract Administrator, also, may at any time, by issuing a Contract Amendment, make changes in the details of the services. The Contractor shall proceed with the performance of any changes in the services so ordered by the Contract Administrator unless the Contractor believes that such order entitles him to a change in the fee or time or both, in which event he shall give the Contract Administrator written notice thereof within fifteen (15) days after the receipt of the Contract Amendment, and the Contractor shall not execute such amendments pending the receipt of an executed Notice to Proceed instruction from the County. The County may, when changes are minor or when changes would result in relatively small changes in the Fee or Contract Time, elect to postpone the issuance of a Contract Amendment until such time that a single amendment of substantial importance can be issued incorporating several changes. In such cases, the County shall indicate this intent in a written notice to the Contractor.

Award

Bridges / Tunnels

$812,022.00

Public - County

Site Work

45

5

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
47
Bidding Soon
1,384
All Active Projects
493
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2023

December 20, 2023

img_map_placeholder

Mud Green Rd, Temple, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.