Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2023 at 8:00 PM
Updated May 24, 2024
Renovation of a municipal facility in Beverly Hills, California. Completed plans call for the renovation of a municipal facility.
Online Q&A Yes Q&A Deadline August 29, 2023 12:00 PM (PDT) Liquidated Damages $500.00 assessment per calendar day Project Duration 30 days The Project includes, without limitation, replacement of exisitng built-up elastomeric deck coating and weather barrier with new cold-fuild-applied polyurethane roofing/waterproofing membrane system, flashing and metal panels at 331 Foothill Building Canopy as delineated in the construction documents. For detailed work scope refer to the drawings and technical specifications included in Exhibits A & B of this package. The impact of construction shall be minimized to the greatest practical extent. Noisy work, or work that requires special access and material delivery/installation shall be coordinated with Project Administration to ensure impact to facility operations are minimized. If the contractor employs use of scaffolding for work area access, the scaffolding shop-drawings will need to bear pre-approved engineering stamp or will need to be approved by the building department before start of construction.
Bid Results
Municipal
$204,535.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2023
October 9, 2023
331 Foothill Rd, Beverly Hills, CA
Related To This Project
Beverly Hills, CA
Bid Date: Jan 23 2024
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Jan 06 2022
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Nov 30 2021
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Mar 03 2022
Beverly Hills, CA
--
Beverly Hills, CA
--
Beverly Hills, CA
--
Beverly Hills, CA
Bid Date: Sep 01 2023
Beverly Hills, CA
Bid Date: Aug 11 2023
Beverly Hills, CA
Bid Date: May 14 2020
Beverly Hills, CA
Bid Date: Aug 14 2023
Beverly Hills, CA
Bid Date: Aug 17 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
