BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2024 at 8:00 PM

Updated May 31, 2024

Site work for a civil project in Granbury, Texas. Completed plans call for site work for a water / sewer project.

The Brookside Water Production Facility will provide potable water service to a new multi-use development in Hood County. The facility will include construction of: 200,000-gallon Welded Steel Ground Storage Tank High Service Pump Station 12,000-gallon Hydropneumatics Tank Yard Pipe and Valves Control Systems including SCADA Equipment Security Fencing Site Work Disinfection Systems Monitoring Equipment Submit all questions regarding clarification or interpretation of Bidding Documents to the office of the Engineer, Pape-Dawson Consulting Engineers, LLC, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, Attn: Ted Nelson, CCM, CFM Phone (214) 420-8494 (ext. 673) or Fax (214) 420-8498, or email TNelson@Pape-Dawson.com. The Owner reserves the right to reject any or all bids and to waive any informalities or minor defects. In case of the lack of clarity or ambiguity in prices, the Owner reserves the right to accept the most advantageous or reject the bid. All bids received after the closing time designated above will be returned unopened. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. . Work of this proposed Contract comprises installation of water production facility, including ground storage tank, piping, high service pump station, hydropneumatic tank, controls, SCADA equipment, disinfection systems, monitoring equipment and general construction work. B. Location: Cresson Municipal Utility District No. 1 is located at the intersection of Old Granbury Road and US 377 in Cresson, Texas. 1.07 CONTRACT TIME A. Contractor is to identify the Contract Time to complete the work on the Bid Form. The completion date in the Agreement shall be the Contract Time added to the commencement date. The Contract Time shall be provided in Calendar Days. B. Owner requires that the work under this contract be completed as quickly as possible and consideration will be given to time of completion when reviewing the submitted bids and awarding the Contract.

Bid Results

Water / Sewer

$7,499,000.00

Public - County

Site Work

110

27

13

6

Subscribe For Documents

195 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
177
Bidding Soon
3,635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

July 29, 2024

Project location map

US-377 & Old Granbury Rd, Granbury, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.