BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Granbury, Texas. Completed plans call for site work for a water / sewer project.

Contractor shall perform the Work in accordance with the Contract Documents, to the satisfaction of Owner and in a good and workmanlike manner. It is understood that, except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, utilities, light, power, fuel, transportation, surveying, supervision, temporary construction of every nature and all other services and facilities of every nature whatsoever necessary in the permitting, performance, testing, start-up, completion and delivery of the Work within the specified time. Notwithstanding the immediately preceding sentence, Owner shall provide reasonable amounts of water necessary for testing the Work. Such water may need to be transported by Contractor from one of the Owners nearby water systems. Any work necessary to be performed after regular hours, on Saturdays, Sundays or legal holidays: (i) shall be performed without additional expense to Owner; and (ii) requires the consent of Owner. As part of the Work and upon final completion thereof, Contractor shall provide Owner a copy of the Drawings in a red-line format, showing actual changes in the as built Work in comparison to the Drawings approved prior to commencement of the Work. However, nothing in the immediately preceding sentence is intended to or shall permit any changes in the Work that are not first approved by Owner in accordance with the Contract Documents. Scope inlcudes repaceement of existing 2-4" PVC water line with new 1,950 LF 8-IN C900 PVC Water Line and 8,400 LF 6-IN C900 PVC Water Line. Approximately 63 water services will be reconnected, including several services which will be moved from back of lot to front of lot. The meter relocations from front of lots to back of lots will require the service of licenced plumber. The 3 EA meter relocations from front of lot to back of lots will require the service of licensed plumber for all work connecting meter to existing service at resident home. Question Deadline 09/11/2023 at 5:00 PM CT

Award

Water / Sewer

$300,000.00

Public - City

Site Work

25

22

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
59
Bidding Soon
3,419
All Active Projects
1,348
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

October 16, 2023

img_map_placeholder

Multiple Locations, Granbury, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.