BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a military facility in Fort Bliss, Texas. Completed plans call for site work for a military facility.

Any questions must be submitted in writing no later than Aug 23, 2023 at 11:00am EST DEA/EPIC BLDG 11339 Ssg Sims, Ft. Bliss, TX 1) Restore/Upgrade all irrigation systems around the building to its full potential. 2) Change/install new sprinkler heads and line as necessary in Front lawn/grass areas to get proper coverage all the way to the fence line. Area is approximately 11,500 SF. 3) Convert current rotor sprinkler/spray head system to drip system to all shrubs and trees on Front/East, Front/West, East, Back/East of Building approximately 23,000 SF area to make sure that each shrub/tree is receiving water. 4) Run new line necessary to install emitters to the proper root areas of all shrubs and trees to Front/West side of bldg where system is not working, and shrubs are currently being hand watered. Area is approximately 7,500 SF. 5) Install new line and emitters to all parking lot shrubs to have a 1:1 ratio-approximately 650 LF. 6) Replace Backflow and timer controls that are not working in the inner garden area to allow for automatic watering. 7) Install a completely new irrigation system to the areas where there are no water lines (Front/West side of bldg, all of West side of bldg, Back/West side of bldg) approximately 23,500 SF area. 8) Restore weed barrier and rocks where new irrigation lines will be installed. 9) Convert current rotor sprinkler/spray head nozzles at Back/East area of bldg to bubblers/drip emitters where it is needed to ensure proper watering to all plants- approximately 10,000 SF area. 10) Repair electrical wiring to back building station to ensure watering of trees lining Back/East side of rear parking lot. 11) Replace 10 irrigation valves that are not opening correctly. 12) Ensure entire system is restored and upgraded for proper watering of the entire lawn, all shrubs, and all trees. 13) Provide As-Built Plans of new installations.

Post-Bid

Military

$400,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
245
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

September 25, 2023

img_map_placeholder

11339 Ssg Sims St, Fort Bliss, TX

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.