BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Marathon, Florida. Working plans call for the renovation of a water / sewer project.

As of December 7,2023, bids received were rejected. No definite date for the rebid. The City is proposing to install a vinyl cell sheet pile flood wall around the City of Marathon Area 6 Wastewater Treatment Plant with three flood barriers and automatic access gates. The flood wall consists of vinyl cells embedded 13ft below existing grade (min) with top elevation of 12.5 NGVD. 4" SCH40 Steel Pin Piles will be spaced at 7ft on-center with an embedment of 18ft. The top of the wall shall have a continuous poured pile cap reinforced with fiberglass rebar. See bid set plans for more details. BID SECURITY (BID BOND): 5% Contract Term. The Work shall be substantially completed within Three Hundred (300) calendar days after the date specified in the Notice to Proceed (Substantial Completion), and fully completed and ready for final payment in accordance with the Contract Document within Three Hundred Thirty (330) calendar days after the date specified in the Notice to Proceed (Final Completion). The City reserves the right to reject any or all bids and to waive informalities, except timely submission of bids, in any bids received, to re-advertise for bids or to take any other such actions that may be deemed in the best interests of the City

Final Planning

Water / Sewer

$4,836,304.00

Public - City

Renovation

24

11

27

8

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
6
Bidding Soon
303
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

June 7, 2024

img_map_placeholder

To Be Determined, Marathon, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.